The R3-05 gate's own recipe correction, actioned. Security__Acl__Enabled:
"${OTOPCUA_ACL_ENABLED:-false}" was wired to site-a-1/site-a-2 only, so
`OTOPCUA_ACL_ENABLED=true docker compose up -d central-1 central-2` was a silent
no-op ("Running", no recreate, no env) — on the one node kind that carries
BoundedApiKeyStore at all, since only a fused admin+driver node wraps
ConfigDbApiKeyStore. The gate had to proceed via a scratch compose override.
The key is now on central-1 and central-2 too, same env var and same default
false, so today's rig behaviour is byte-identical and the plan's step 1 does what
it says. site-b stays hardcoded OFF as the A/B control.
Plan gains a "## S18 hard-deadline follow-up (2026-08-20)" section: the
cooperative-vs-hard root cause, the red-before-green observation (3/18 failing
with TimeoutException, and why the 15 existing deadline tests could not see it),
the fix, and the still-owed live re-gate table (expected vs. what the gate saw).