6bf147a113
The parity matrix gate is the precondition for retiring the legacy Galaxy projects. The 24h × 50k soak run and 2-week production pilot were sketched in early planning as additional safety nets but aren't operationally applicable for this deployment — there's no separate production fleet to pilot against, and the soak harness's value is as ongoing diagnostic infrastructure (still shipped in PR 6.4) rather than a one-shot release gate. PR 7.2's only remaining precondition is the matrix being fully green or carrying documented accepted-deltas — verified 2026-04-30 on the dev rig: 14 passed / 1 skipped / 0 failed. Affected: - docs/v2/Galaxy.ParityMatrix.md "Outstanding deltas" — flips to "PR 7.2 is unblocked" - docs/v2/Galaxy.ParityRig.md "After the rig is green" — drops the three-step soak+pilot flow, keeps only the matrix-doc bookkeeping follow-up - lmx_mxgw_impl.md PR 7.2 "Depends on" — replaces "fully soaked" with the matrix-green precondition + the verification date Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>