v2 release-readiness dashboard update - blocker #1 closed #95

Merged
dohertj2 merged 1 commits from v2-release-readiness-blocker1-closed into v2 2026-04-19 11:06:29 -04:00

1 Commits

Author SHA1 Message Date
Joseph Doherty
ba42967943 v2 release-readiness — blocker #1 closed; doc reflects state
PR #94 closed the Phase 6.2 dispatch wiring blocker. Update the dashboard:
- Status line: "two of three release blockers remain".
- Release-blocker #1 section struck through + marked CLOSED with PR link.
  Remaining Stream C surfaces (Browse / Subscribe / Alarm / Call + finer-
  grained scope resolution) downgraded to hardening follow-ups — not
  release-blocking.
- Change log: new dated entry.

Two remaining blockers: Phase 6.1 Stream D config-cache wiring (task #136)
+ Phase 6.3 Streams A/C/F redundancy runtime (tasks #145, #147, #150).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 11:04:30 -04:00