v2 release-readiness dashboard update - blocker #1 closed #95

Merged
dohertj2 merged 1 commits from v2-release-readiness-blocker1-closed into v2 2026-04-19 11:06:29 -04:00
Owner

Mirror the PR #94 dispatch-wiring ship in the readiness doc.

Summary

  • Status line: two of three release blockers remain.
  • Release blocker #1 section struck through with CLOSED note linking PR #94. Additional Stream C surfaces (Browse / Subscribe / Alarm / Call + finer-grained scope resolution) downgraded to hardening follow-ups.
  • Change log: new dated entry.

🤖 Generated with Claude Code

Mirror the PR #94 dispatch-wiring ship in the readiness doc. ## Summary - Status line: two of three release blockers remain. - Release blocker #1 section struck through with CLOSED note linking PR #94. Additional Stream C surfaces (Browse / Subscribe / Alarm / Call + finer-grained scope resolution) downgraded to hardening follow-ups. - Change log: new dated entry. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
dohertj2 added 1 commit 2026-04-19 11:06:20 -04:00
PR #94 closed the Phase 6.2 dispatch wiring blocker. Update the dashboard:
- Status line: "two of three release blockers remain".
- Release-blocker #1 section struck through + marked CLOSED with PR link.
  Remaining Stream C surfaces (Browse / Subscribe / Alarm / Call + finer-
  grained scope resolution) downgraded to hardening follow-ups — not
  release-blocking.
- Change log: new dated entry.

Two remaining blockers: Phase 6.1 Stream D config-cache wiring (task #136)
+ Phase 6.3 Streams A/C/F redundancy runtime (tasks #145, #147, #150).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
dohertj2 merged commit fc7e18c7f5 into v2 2026-04-19 11:06:29 -04:00
Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: dohertj2/lmxopcua#95