Joseph Doherty 88ce8df099 docs: close the plan-bookkeeping drift and state the tier truth (§8.5, §8.6, #522)
Bookkeeping: 13 .tasks.json files closed — the 8 the audit named, plus
mesh-phase4 (Task 9 landed 3a590a0c), the 4th stillpending phase file, and
historian-tcp-transport closed as OBSOLETE (it targets the retired Wonderware
sidecar; there is no Wonderware backend in the tree). Each carries a
closureNote naming the evidence rather than just a status flip.

11 archreview live gates written back from STATUS.md, which had recorded them
passed since 2026-07-13/15 without ever updating the task files: R2-01 #11,
R2-02 #15/#18, R2-05 T15, R2-06 T12, R2-07 T5/T6/T12/T14, R2-11 T22/T24.

R2-03 and R2-10 were deliberately NOT closed. STATUS.md's headline says "every
Round-2 live gate is now GREEN", but its own per-item detail says R2-03 is
"live-blocked on this data-less rig" and R2-10 verified the pipeline with
"breaker-OPEN state not forced". Both now carry an openNote recording the
actual blocker.

The point of the sweep: ~140 phantom pending tasks are gone, so the genuinely
unexecuted 19-task AdminUI follow-ups plan is now the largest open item in
docs/plans/ instead of being buried under work that shipped months ago.

Tier truth: docs/v2/driver-stability.md now states that its tier table is
aspirational — every driver runs Tier A because no factory passes a tier, so
MemoryRecycle and ScheduledRecycleScheduler have never engaged, and the config
parser validates a RecycleIntervalSeconds that does nothing. It also corrects a
staleness the audit missed: the separate-Windows-service hosting it describes
for Tier C no longer exists (Galaxy moved to the mxaccessgw sidecar in PR 7.2,
FOCAS went in-process with its managed wire client). docs/drivers/README.md
already said Tier A for both, so the two no longer contradict.

No runtime change — enabling recycle on two live drivers wants its own live
gate, not a docs-pass side effect. Keep-or-delete tracked as Gitea #522.
2026-07-27 19:54:41 -04:00
Joseph Doherty 534e03bc74 docs(archreview): record R2-03 (02/S13+S12+P7) fixed on branch; full VT suites green 2026-07-13 10:18:10 -04:00
Joseph Doherty a916ae6ebe perf(runtime): gate the VT apply-boundary compile-cache clear on a changed expression set (02/P7) 2026-07-13 10:15:47 -04:00
Joseph Doherty 37664e6992 test(runtime): red — apply-boundary compile-cache clear must be gated on a changed expression set (02/P7) 2026-07-13 10:14:50 -04:00
Joseph Doherty ef00d6e5aa fix(host): retry VT evaluation once on ObjectDisposedException from the apply-boundary cache clear (02/S12) 2026-07-13 10:12:59 -04:00
Joseph Doherty d67900e455 test(host): red repro — apply-boundary cache clear races in-flight VT evaluation into ObjectDisposedException (02/S12) 2026-07-13 10:09:37 -04:00
Joseph Doherty 05c35c93d9 test(host): pin sequential clear-then-recompile contract of RoslynVirtualTagEvaluator (02/S12 baseline) 2026-07-13 09:55:44 -04:00
Joseph Doherty f2006adb79 test(runtime): pin VT inputs-ready gate — no Bad flash before all dependencies arrive (02/S13) 2026-07-13 09:55:04 -04:00
Joseph Doherty 987459fab3 test(runtime): pin VT Bad-quality transition semantics — once-per-transition, same-value recovery, throw path (02/S13) 2026-07-13 09:53:59 -04:00
Joseph Doherty 01253818de fix(runtime): VT script failure/timeout degrades node quality to Bad once per transition (02/S13) 2026-07-13 09:52:56 -04:00
Joseph Doherty c5ca3e8587 feat(runtime): EvaluationResult carries OpcUaQuality; VT bridge publishes it + historizes BadInternalError on Bad (02/S13) 2026-07-13 09:51:15 -04:00
Joseph Doherty b977548593 test(runtime): red repro — VT script failure after success leaves node stale-Good (02/S13) 2026-07-13 09:48:41 -04:00
Joseph Doherty 1891f5d6a7 docs(archreview): 2026-07-12 re-review at f6eaa267 + 12 round-2 remediation plans
Re-ran all seven domain reviews at master f6eaa267 (reports rewritten in
place, each with a prior-finding status table): all 4 round-1 Criticals
verified closed; new top findings are the S7 connect-timeout OCE regression
(05/STAB-14), the ResilienceConfig operator-authorable brick (01/S-6), and
a batch of resilience-seam Mediums. 00-OVERALL.md carries the updated
maturity matrix + 12-item action list.

Adds R2-01..R2-12 design/implementation plans (one per action item, house
format + bite-sized TDD task breakdowns + co-located .tasks.json; 193 tasks,
~18-24 dev-days). STATUS.md updated: round-1 topology marked historical
(all merged+pushed), re-review findings table + plan pointers added.