Files
scadaproj/impeccable/IMPLEMENTATION-PLAN.md
T
2026-11-14 02:36:01 -05:00

14 lines
1.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Implementation plan
The detailed plan, with bUnit standardization before shared-theme work, is saved at:
[SCADA Family UI Consistency Implementation Plan](../docs/plans/2026-11-12-scada-ui-consistency.md)
It contains the dependency order, shared API/token decisions, release gates, adoption matrix, verification requirements and rollback rules. It begins with a mandatory [bUnit 2.7.2 phase](../docs/plans/2026-11-12-scada-ui-consistency/BUnit.md) covering all seven existing bUnit test projects, dependency compatibility, API migration and verification before the shared Theme. Its remaining project chapters cover Theme, Secrets UI, Overview, ScadaBridge, OtOpcUa, MxAccessGateway, HistorianGateway, BTDB and ignitionoee (router, registry and native Perspective).
The chapters map every recommendation to implementation tasks with exact files, regression tests, commands, expected outcomes, visual checks and commits. [Task ledger](../docs/plans/2026-11-12-scada-ui-consistency/tasks.json) records task acceptance; [source baselines](../docs/plans/2026-11-12-scada-ui-consistency/source-baselines.json) records revision drift since the review.
The plan was originally a planning-only deliverable. Authorized implementation subsequently completed all 100 tasks, beginning with the bUnit gate and shared packages; the [execution record](../docs/plans/2026-11-12-scada-ui-consistency/EXECUTION.md) records actual changes, verification, immutable deliveries and retained rollout limits. No application deployment is implied. The mockups remain illustrative visual references rather than copy-and-paste production pages. VoiceOver testing is excluded by the user’s November 14 instruction.
Final candidate acceptance, test counts, cleanup and retained rollout limits are recorded in [G3](../components/ui-theme/validation/cross-project-final/G3.md).