Task 56: removes the legacy in-process Server + Admin Web project + their test projects (Server.Tests, Admin.Tests, Admin.E2ETests). The fused OtOpcUa.Host binary built across Phases 1-9 is now the sole production entry point. What happened to the 47 legacy Admin Blazor pages: per follow-up F15, the v1 architecture's draft/publish UX is replaced by v2's live-edit + snapshot- deploy model, so a 1:1 migration is not meaningful. The mechanical move via git mv preserves the history; service classes + page bodies that referenced removed v1 types (ConfigGeneration, RedundancyRole, GenerationId) were deleted. AdminUI now ships a minimal Home page + the v2 Deployments page. Per-page rebuild against the v2 surface is tracked as F15. The v2 Deployments page (Task 52) is the only first-party UI shipping in this PR. Task 57: solution build green; 84+ tests green across active v2 + legacy driver test projects.
7.2 KiB
7.2 KiB