v2 release-readiness dashboard - blocker #2 closed #97

Merged
dohertj2 merged 1 commits from v2-release-readiness-blocker2-closed into v2 2026-04-19 11:18:27 -04:00

1 Commits

Author SHA1 Message Date
Joseph Doherty
a8401ab8fd v2 release-readiness — blocker #2 closed; doc reflects state
PR #96 closed the Phase 6.1 Stream D config-cache wiring blocker.

- Status line: "one of three release blockers remains".
- Blocker #2 struck through + CLOSED with PR link. Periodic-poller + richer-
  snapshot-payload follow-ups downgraded to hardening.
- Change log: dated entry.

One blocker remains: Phase 6.3 Streams A/C/F redundancy runtime (tasks
#145, #147, #150).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 11:16:31 -04:00