Commit Graph

2 Commits

Author SHA1 Message Date
Joseph Doherty 88ce8df099 docs: close the plan-bookkeeping drift and state the tier truth (§8.5, §8.6, #522)
Bookkeeping: 13 .tasks.json files closed — the 8 the audit named, plus
mesh-phase4 (Task 9 landed 3a590a0c), the 4th stillpending phase file, and
historian-tcp-transport closed as OBSOLETE (it targets the retired Wonderware
sidecar; there is no Wonderware backend in the tree). Each carries a
closureNote naming the evidence rather than just a status flip.

11 archreview live gates written back from STATUS.md, which had recorded them
passed since 2026-07-13/15 without ever updating the task files: R2-01 #11,
R2-02 #15/#18, R2-05 T15, R2-06 T12, R2-07 T5/T6/T12/T14, R2-11 T22/T24.

R2-03 and R2-10 were deliberately NOT closed. STATUS.md's headline says "every
Round-2 live gate is now GREEN", but its own per-item detail says R2-03 is
"live-blocked on this data-less rig" and R2-10 verified the pipeline with
"breaker-OPEN state not forced". Both now carry an openNote recording the
actual blocker.

The point of the sweep: ~140 phantom pending tasks are gone, so the genuinely
unexecuted 19-task AdminUI follow-ups plan is now the largest open item in
docs/plans/ instead of being buried under work that shipped months ago.

Tier truth: docs/v2/driver-stability.md now states that its tier table is
aspirational — every driver runs Tier A because no factory passes a tier, so
MemoryRecycle and ScheduledRecycleScheduler have never engaged, and the config
parser validates a RecycleIntervalSeconds that does nothing. It also corrects a
staleness the audit missed: the separate-Windows-service hosting it describes
for Tier C no longer exists (Galaxy moved to the mxaccessgw sidecar in PR 7.2,
FOCAS went in-process with its managed wire client). docs/drivers/README.md
already said Tier A for both, so the two no longer contradict.

No runtime change — enabling recycle on two live drivers wants its own live
gate, not a docs-pass side effect. Keep-or-delete tracked as Gitea #522.
2026-07-27 19:54:41 -04:00
Joseph Doherty 76e55fc112 docs(drivers): Wave 0-2 tracking doc + Wave 1/2 implementation plans
Add a living progress tracker (docs/plans/2026-07-24-driver-expansion-tracking.md)
for the driver-expansion program's Waves 0-2, linked from the program design doc's
document map. One row per deliverable pointing at design + implementation plan + status.

Add executable implementation plans (plan .md + co-located .tasks.json) for the four
Wave 1/2 drivers, each authored by writing-plans methodology off its design doc and
mirroring the relevant existing driver:

- Modbus RTU        11 tasks  (extends Driver.Modbus; RTU-over-TCP, direct-serial descoped)
- SQL poll          22 tasks  (ISqlDialect seam, SQL Server only in v1; SQLite + central-SQL fixtures)
- MTConnect Agent   23 tasks  (browse free via Wave-0 seam; TrakHound-vs-hand-rolled = Task 0)
- MQTT/Sparkplug B  27 tasks  (P1 plain MQTT 0-14 then P2 Sparkplug 15-26; MQTTnet-5 pinning spike = Task 0)

Wave 0 (universal browser) remains merged (056887d6) with its live gate open (#468).
All four new plans are design-only -> plan-ready; nothing built yet.