Update status.md for session handoff to CC 4.7

Session bookmark updated: captures all work done 2026-04-15 through
2026-04-23, removes stale session ID (new session will self-orient from
CLAUDE.md + status.md), updates resume flow for a fresh start.
This commit is contained in:
Joseph Doherty
2026-04-23 12:29:24 -04:00
parent 7d44802517
commit c8d7bf37de

View File

@@ -1,14 +1,24 @@
# Plan — Working Session Status # Plan — Working Session Status
**Saved:** 2026-04-15 **Saved:** 2026-04-23
**Claude Code session ID:** `4851af09-c6b2-41fd-a419-a43d8cf80721` **Previous session:** Opus 4.6 (1M context)
**Resume with:** `claude --resume 4851af09-c6b2-41fd-a419-a43d8cf80721` (or pick from `/resume` inside Claude Code) **Resume with:** start a new Claude Code session in this directory — `CLAUDE.md` and this file provide full context. No session ID needed; the plan is self-contained in the repo.
> This file is a **bookmark**, not a replacement for the plan. The authoritative content lives in `CLAUDE.md`, `current-state.md`, `goal-state.md`, `roadmap.md`, and the component detail files under `current-state/`, `goal-state/`, and `outputs/`. Read this file only to find out where we left off. > This file is a **bookmark**, not a replacement for the plan. The authoritative content lives in `CLAUDE.md`, `current-state.md`, `goal-state.md`, `roadmap.md`, and the component detail files under `current-state/`, `goal-state/`, and `outputs/`. Read this file only to find out where we left off.
## Where we are ## Where we are
The plan is substantively fleshed out. All three core documents are populated, the canonical model + UNS framing has been declared, the digital twin management conversation has happened and been absorbed, and most open items are either design-time details the build team can close or items deliberately marked out of scope. An output generation pipeline (PPTX + PDF) has been scaffolded with spec files but no outputs generated yet. The plan is **substantially complete**. All core documents are populated, architectural decisions are captured with rationale, the canonical model + UNS hierarchy standard are declared, the digital twin use cases are absorbed, the OtOpcUa v2 implementation corrections (19 items + addendum) are integrated, and the first PPTX has been generated. The `schemas/` repo seed exists with the FANUC CNC pilot class and JSON Schema format definitions.
**What happened since the original session (2026-04-15 through 2026-04-23):**
- Integrated OtOpcUa v2 implementation corrections (19 corrections + hardening addendum: ACL model committed, stability tiers, multi-identifier equipment model, driver list confirmed, cutover ownership assigned outside OtOpcUa)
- Schemas repo seed contributed by OtOpcUa team at `schemas/` (temporary location)
- Enterprise shortname resolved to `zb`; Warsaw West buildings confirmed as 5 and 19
- Equipment protocol survey removed (driver list confirmed directly by v2 team)
- First PPTX generated (18 slides, mixed-stakeholder deck)
- 7 component diagrams created (OtOpcUa, Redpanda, SnowBridge, ScadaBridge dataflow + topology, Snowflake/dbt)
- ScadaBridge accuracy corrections from design repo review (email only, not Teams; EventHub not yet implemented)
- ScadaBridge topology corrected (no site-to-site routing; direct API access; inbound Web API as input)
### Files ### Files
@@ -100,14 +110,14 @@ Items that can wait, design details that close during implementation, and delibe
## Recommended resume flow ## Recommended resume flow
1. Resume the Claude Code session (`claude --resume 4851af09-c6b2-41fd-a419-a43d8cf80721`). 1. Start a new Claude Code session in this directory. `CLAUDE.md` and this file provide full context.
2. Skim this file and `CLAUDE.md` to re-orient (~2 minutes). 2. Skim this file to re-orient (~2 minutes).
3. Pick one of the three external-dependency items above — or whatever has become most pressing — and tell me which. 3. Pick one of the three external-dependency items above — or whatever has become most pressing.
4. If you've already had the Power BI coordination conversation with the reporting team, bring the answers and I'll fold them into the plan. 4. If you've had the Power BI coordination conversation with the reporting team, bring the answers and I'll fold them into the plan.
5. If a funded simulation initiative has materialized (digital twin use case 2), say so and I'll reuse the meeting brief for a scoping conversation. 5. If a funded simulation initiative has materialized (digital twin use case 2), say so and I'll reuse the meeting brief for a scoping conversation.
6. If the equipment protocol survey walk has been run, bring the data and I'll populate both `current-state/equipment-protocol-survey.md` and the initial UNS hierarchy snapshot in one pass. 6. If the UNS hierarchy walk has been run, bring the data and I'll populate the initial hierarchy snapshot in the `schemas` repo.
7. If the enterprise shortname has been assigned (currently `ent` placeholder in `goal-state.md`), tell me and I'll propagate the find-and-replace across the UNS hierarchy examples. 7. To regenerate outputs: `regenerate presentation` (PPTX), `regenerate longform` (PDF, not yet run), or `regenerate outputs` (both). See `outputs/README.md` for the full checklist.
8. When ready to generate outputs (deck + PDF), say `regenerate outputs`, `regenerate presentation`, or `regenerate longform` and I'll follow the checklist in `outputs/README.md`. 8. To hand off a component to an implementation agent, check `handoffs/` for existing handoff docs or ask me to create one.
## What not to do on resume ## What not to do on resume