dohertj2 dohertj2
  • Joined on 2026-02-20
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 10:59:54 -05:00
41ea272c8a chore(batch42-47): reconcile porting.db after all deferred feature batches
9690275287 Merge branch 'worktree-agent-adb1298d'
6a030151fc feat(batch47): implement MQTT full runtime — JSA bridge, sessions, account manager, protocol handlers
a321f96c6d Merge branch 'worktree-agent-a4679340'
65c8e932e2 feat(batch45): implement events server methods — stats, remote tracking, connection events
Compare 13 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 07:56:48 -05:00
ecd18cf1a9 chore: re-audit all batch 16-41 features and tests after merge
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 06:39:23 -05:00
552e58cb26 chore: update report timestamp after all batches 16-41 complete
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 02:45:59 -05:00
214b145d76 chore(batch35): reconcile porting.db after merge
037fb4bfc8 feat(batch35): merge js-cluster-remaining
6a14aa816b batch35: finalize audits, batch completion, and report
788abc1702 batch35: add and verify raft test waves T2-T4
9e4405c2a1 batch35: add and verify test wave T1
Compare 9 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 02:32:17 -05:00
4c3a3fad69 chore(batch25): reconcile porting.db after merge
73d9871be6 feat(batch25): merge gateways
c6363745bc feat(batch25): complete gateways implementation and verification
ee1ab96d7c feat(batch25): verify gateway features and tests
015b19b6f6 test(batch25): port cross-module gateway integration tests
Compare 13 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 02:03:25 -05:00
f0b50c0b4c chore(batch29): reconcile porting.db after merge
073ee6b0ee chore(batch29): complete batch tracking and refresh status report
e88f780033 test(batch29): add mapped raft node tests for batching behavior
6ae023d4a7 feat(batch29): implement jetstream batching group-b validation and apply state
02d3b610a1 feat(batch29): implement jetstream batching group-a lifecycle/store methods
Compare 6 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 01:35:41 -05:00
93f34c4782 chore(batch39): reconcile porting.db after merge
58db8adbc7 feat(batch39): merge consumer-dispatch
a99fa837b2 chore(batch24): reconcile porting.db after merge
8dcd582e8d chore(batch24): remove generated build artifacts
3e9ad16033 feat(batch24): complete leaf nodes implementation and verification
Compare 12 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 01:13:56 -05:00
ff7e674ec4 chore(batch41): reconcile porting.db after merge
b5d736ce89 feat(batch41): merge mqtt-client-io
f2b1928a94 batch41: implement mqtt reader/writer and subject conversion slice
Compare 3 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 00:58:40 -05:00
af732e6b12 chore(batch38): reconcile porting.db after merge
2aaa38cad9 feat(batch38): merge consumer-lifecycle
0ff6e5c952 chore(batch38): complete batch and refresh porting report
d5ab169bc5 test(batch38-t5): add perf/race/mqtt/benchmark mapped tests
64048c8c51 test(batch38-t4): add engine/account lifecycle integration tests
Compare 14 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 00:54:29 -05:00
988ec0d60c chore(batch40): reconcile porting.db after merge
cea24f2661 batch40 task6: closure verification and final checkpoint
c9b525667e batch40 task5: process group D and waves T4-T5 blockers
ddf026bec6 batch40 task4: process group C and wave T3 blockers
f60d11aaed batch40 task3: process group B and wave T2 blockers
Compare 7 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-03-01 00:22:53 -05:00
9599c19449 chore(batch37): reconcile porting.db after merge
9644e4fad6 feat(batch37): merge stream-messages
8d89dffb7e batch37 task10 complete batch and refresh report
17dd355d46 batch37 task9 verify wave T3 test statuses
97b4f06dc4 batch37 task8 verify wave T2 test statuses
Compare 11 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 23:55:57 -05:00
5dcaba3323 chore(batch34): reconcile porting.db after merge
797c035b2a feat(batch34): merge js-cluster-consumers
1916eab00a chore(batch34): complete batch closure and refresh status report
11011a503a chore(batch34): verify test wave T5 status set
4947e3cdf4 chore(batch34): verify test wave T4 status set
Compare 12 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 23:29:12 -05:00
aaccc16b93 chore(batch36): reconcile porting.db after merge
cce3163695 feat(batch36): merge stream-lifecycle
9e98bf7e6d batch36 final deferred blocker notes
f38c0e6b6e batch36 task5-6 group-d-e and test waves t3-t4
856cd17554 batch36 task4 stream mirror lifecycle helpers
Compare 8 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 23:16:08 -05:00
0a807e4525 chore(batch33): reconcile porting.db after merge
f5c27e5ec1 feat(batch33): merge js-cluster-streams
593f50dad4 batch33 task8 finalize audits batch completion and report
2f2581b335 batch33 task7 port wave T3 raft tests
cbc6ff7144 batch33 task6 port wave T2 raft tests
Compare 10 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 22:42:32 -05:00
b7e7d233f2 chore(batch28): reconcile porting.db after merge
bbf3e8128a feat(batch28): merge jetstream-api
b99344a9e7 feat(batch28): complete jetstream api feature and test port
28115ae79c test(batch28): port jetstream api object-shape and delayed-response tests
d6754eae25 feat(batch28): implement jetstream api consumer/message/snapshot handlers
Compare 8 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 22:33:15 -05:00
6a38274948 chore(batch32): reconcile porting.db after merge
7b32eaeadd Update batch 32 tracker status and regenerate report
34bc4e1137 Add batch 32 JS cluster meta backlog test mappings
7e8b81b648 Port batch 32 JS cluster meta feature implementations
Compare 4 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 21:57:35 -05:00
e878246bed chore(batch26): reconcile porting.db after merge
583867bc1d feat(batch26): merge websocket
d487dca56e feat(batch26): complete websocket batch with verified implementation and tests
04c8173651 test(batch26): resolve benchmark-mapped websocket test IDs
becd3c92b0 test(batch26): port cross-module websocket-dependent tests
Compare 9 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 21:46:13 -05:00
aadb024987 chore(batch27): reconcile porting.db after merge
28f2a075fd feat(batch27): merge jetstream-core
451d03946c feat(batch27): complete jetstream core features and mapped tests
b28134ffe8 test(batch27): port jetstream engine heavy test wave
941eaa62a6 test(batch27): port wave-b filestore-consumer-concurrency tests
Compare 11 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 21:34:02 -05:00
bbacf439ed chore(batch23): reconcile porting.db after merge
09c42538c2 feat(batch23): complete routes implementation and verification
3501320c6e test(batch23): port and verify mapped route tests
51c899b651 feat(batch23): implement route lifecycle, solicitation, dedupe, and iteration
acf51bf480 feat(batch23): implement route subscription propagation and creation helpers
Compare 7 commits »
dohertj2 pushed to main at dohertj2/natsnet 2026-02-28 20:56:20 -05:00
0fd5dc71fc chore(batch31): reconcile porting.db after merge
c1734609a1 feat(batch31): merge raft-part-2
3bbb6efddb batch31: complete raft part 2 batch
57be6da558 batch31: verify raft test wave t2 statuses
09c407781a batch31: verify raft test wave t1 statuses
Compare 8 commits »