mbproxy/docs: retire superseded design/plan docs and dissolve DL260/

The standalone design.md, kpi.md, operations.md, and the docs/plan/
phase tree were point-in-time planning artefacts now superseded by the
topic-organized docs/ tree (Architecture/, Features/, Operations/,
Reference/, Testing/). The DL260/ folder mixed a device-reference doc, a
test fixture, a sample test, and a screenshot; its contents now live in
their natural homes (dl205.md + mbtcp_settings.JPG under docs/Reference/,
dl205.json next to its launcher in tests/sim/, sample test dropped).

All cross-references in the surviving docs, README, CLAUDE.md, the config
template, and source comments are repointed to the new locations.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
Joseph Doherty
2026-05-15 07:37:18 -04:00
parent 0a603f94d0
commit 7466a46aa7
48 changed files with 67 additions and 3518 deletions
+1 -1
View File
@@ -101,7 +101,7 @@ The rolling log lives at `C:\ProgramData\mbproxy\logs\mbproxy-<date>.log`. The l
Test-NetConnection -ComputerName <plc-ip> -Port 502
```
2. Verify the host/port in `appsettings.json` matches the PLC's actual settings (see `DL260/mbtcp_settings.JPG` for the as-deployed values).
2. Verify the host/port in `appsettings.json` matches the PLC's actual settings (see `docs/Reference/mbtcp_settings.JPG` for the as-deployed values).
3. If `Test-NetConnection` succeeds but the proxy still fails, inspect the upstream client count for that PLC on the status page — if it is at 4 and a new connect attempt fires, the ECOM cap is the cause.
4. If the PLC has rebooted, the supervisor retries automatically on the Polly backend-connect pipeline (3 attempts at 100ms / 500ms / 2000ms per upstream request).