Files
scadaproj/docs
Joseph Doherty 5a965639f9 docs: implementation plan for ZB.MOM.WW.Health adoption across the 3 sister apps
Detailed task-by-task plan (publish to Gitea, then per-repo behaviour-preserving
probe swaps) incorporating recon findings that revised the design: MxGateway worker
IPC is named pipes (custom SQLite readiness probe instead of gRPC), ScadaBridge
ActorSystem is not in DI (transient bridge), downstream gRPC probes + IDbContextFactory
switch + ScadaBridge seam unification deferred.
2026-06-01 13:15:48 -04:00
..