# Execution checkpoint — November 13, 2026 Active objective: execute all 100 plan tasks, with all seven bUnit projects verified before any Theme/UI updates. This checkpoint is partial progress, not completion. Worktree: `/Users/dohertj2/.codex/worktrees/scada-ui-consistency/scadaproj`; branch `codex/scada-ui-consistency`; source base `9c3ab5f`. | Project | Fresh before | After 2.7.2 / parser 1.5.2 | State | |---|---|---|---| | Theme | 70 pass | 70 pass | verified | | Secrets UI | 34 pass | 34 pass | verified, clean-output confirmation | | Overview | 197 pass | 197 pass | verified, clean-output confirmation | | ScadaBridge | not run | not run | managed worktree pending | | OtOpcUa | not run | not run | managed worktree pending | | HistorianGateway | not run | not run | managed worktree pending | | BTDB | not run | not run | managed worktree pending | All three verified projects retain exact test identities/outcomes, zero failures/skips, clean transitive vulnerability reports and no production test-package leakage. Changes are test-only dependencies and fixture API migration. No Theme component/CSS/public API or app UI source was changed. Parent pending worktree batch: functions cell `g4:77`. Agent pending cells: ScadaBridge `g6:41`, OtOpcUa `g6:43`, HistorianGateway `g7:39`. Calls are yielded/live, not reported as terminal errors. No corresponding sister worktrees or Git worktree-creation process were observed in the last read-only check. Do not duplicate/restart based solely on elapsed time. Poll these handles or inspect returned operation IDs if they arrive. The parent wrapper may report an already-existing branch/copy destination after worktree calls complete; those root setup operations were safely completed while the calls were pending. GB remains OPEN. Do not start TH-01 or other shared/app UI tasks. Continue the four isolated migrations after real paths arrive; then close BU-01/BU-10 using fresh runtime evidence. Evidence: `components/ui-theme/validation/bunit-2.7.2/`. Verified migration commits: Theme `9bda64e`, Secrets UI `f961042`, Overview `8232f3a`. The read-only managed-artifact inventory confirms only the scadaproj worktree is attached. No sister worktree path has been returned. ## Blocked audit The same managed-worktree prerequisite remained unresolved across three consecutive goal turns. The parent handle g4:77 is still live/yielded, not terminal; current Git registries again show no new sister worktrees. The existing ScadaBridge design worktree is unrelated and is not reused. No duplicate creation or original-checkout mutation is attempted. Goal marked blocked pending an external worktree response or explicit user workflow override. All 100 tasks remain the objective; only BU-02/03/05/06 are complete. GB remains open at 3/7 and no Theme/UI work may start. Do not interpret this blocked status as goal completion or cancellation of pending creation calls. ## User-authorized recovery User replied “Authorized” to the explicit option to use existing sister checkouts. This overrides executeplan’s new-worktree requirement for those repositories. Parent request cell g4:77 was explicitly terminated because the workflow changed; it is not treated as a timeout failure or restarted. Child creation calls are being canceled by their owners. No new creation requests are made. Proceed in clean existing sister checkouts on new `codex/scada-ui-consistency` branches, preserving concurrent user changes. Full before/after tests, graph/audit verification and GB remain mandatory. The full objective is resumed; shared Theme/UI work still waits for seven-project acceptance. ## GB accepted — November 13, 2026 Independent audit closed all seven migrations: 5,879 passed, zero failures, 75 unchanged external integration skips. All runtime package hashes and identities verified. See `components/ui-theme/validation/bunit-2.7.2/ACCEPTANCE.md`. BU-01–BU-10 completed. Shared Theme/UI work starts only after this acceptance. The user-authorized existing-checkout workflow remains in effect.