Joseph Doherty
|
1ec057a32a
|
plan: Task 2.5 (ScadaBridge audit full re-arch C1-C7) DONE+reviewed -> PHASE 2 COMPLETE (audit adopted across all 3 repos, deep/canonical, local-only). Next = Phase 3 Actor->principal wiring
|
2026-06-02 15:10:54 -04:00 |
|
Joseph Doherty
|
ca2a9ac507
|
plan(phase2): OtOpcUa 2.1/2.2 + MxGateway 2.3 DONE (deep audit adoption, spec+code reviewed, local-only); ScadaBridge 2.5 pending variant decision
|
2026-06-02 10:26:55 -04:00 |
|
Joseph Doherty
|
abe06a2163
|
plan(phase2): Task 2.0 gate DONE — verified plan specs materially off (MxGw store moved to lib, OtOpcUa path dormant, SB rename structurally impossible); user chose DEEP adopt + pause; corrected deep design in -phase2-deep.md; PAUSED for review
|
2026-06-02 09:13:09 -04:00 |
|