Joseph Doherty
|
abe06a2163
|
plan(phase2): Task 2.0 gate DONE — verified plan specs materially off (MxGw store moved to lib, OtOpcUa path dormant, SB rename structurally impossible); user chose DEEP adopt + pause; corrected deep design in -phase2-deep.md; PAUSED for review
|
2026-06-02 09:13:09 -04:00 |
|