Files
scadalink-design/docs/plans/phase-3b-checklist.md

1.4 KiB

Phase 3B Execution Checklist

Phase: Site I/O & Observability Started: 2026-03-16 Completed: 2026-03-16


Work Package Status

All 35/35 WPs complete. See commit 389f5a0 for full implementation.

Verification Gate

# Gate Criterion Pass
1 OPC UA integration (adapter, subscribe, values flow) [x]
2 Script execution (3 trigger types, min-time, read/write, CallScript, CallShared) [x]
3 Alarm evaluation (3 condition types, state transitions, on-trigger scripts, no script on clear) [x]
4 Script trust model (forbidden APIs rejected, execution timeout) [x]
5 Recursion limit (depth enforced, error logged) [x]
6 Health monitoring (periodic reports, sequence numbers, offline/online detection) [x]
7 Event logging (all categories, retention, cap, remote query, pagination, keyword search) [x]
8 Debug view (subscribe, snapshot, stream, unsubscribe) [x]
9 Communication (all 8 patterns, timeouts, correlation IDs) [x]
10 Failover (DCL reconnect, health continuity, stream recovery, alarm re-eval) [x]
11 Negative tests (cross-instance blocked, alarm call direction, forbidden APIs, etc.) [x]

Summary

  • Total WPs: 35/35 complete
  • New tests: 197 (53 Communication+DCL + 89 SiteRuntime + 55 Health+EventLog)
  • Cumulative tests: 541 passing, 0 failed
  • Build: 0 errors, 0 warnings
  • Verification gate: 11/11 pass