1.4 KiB
1.4 KiB
Phase 3B Execution Checklist
Phase: Site I/O & Observability Started: 2026-03-16 Completed: 2026-03-16
Work Package Status
All 35/35 WPs complete. See commit 389f5a0 for full implementation.
Verification Gate
| # | Gate Criterion | Pass |
|---|---|---|
| 1 | OPC UA integration (adapter, subscribe, values flow) | [x] |
| 2 | Script execution (3 trigger types, min-time, read/write, CallScript, CallShared) | [x] |
| 3 | Alarm evaluation (3 condition types, state transitions, on-trigger scripts, no script on clear) | [x] |
| 4 | Script trust model (forbidden APIs rejected, execution timeout) | [x] |
| 5 | Recursion limit (depth enforced, error logged) | [x] |
| 6 | Health monitoring (periodic reports, sequence numbers, offline/online detection) | [x] |
| 7 | Event logging (all categories, retention, cap, remote query, pagination, keyword search) | [x] |
| 8 | Debug view (subscribe, snapshot, stream, unsubscribe) | [x] |
| 9 | Communication (all 8 patterns, timeouts, correlation IDs) | [x] |
| 10 | Failover (DCL reconnect, health continuity, stream recovery, alarm re-eval) | [x] |
| 11 | Negative tests (cross-instance blocked, alarm call direction, forbidden APIs, etc.) | [x] |
Summary
- Total WPs: 35/35 complete
- New tests: 197 (53 Communication+DCL + 89 SiteRuntime + 55 Health+EventLog)
- Cumulative tests: 541 passing, 0 failed
- Build: 0 errors, 0 warnings
- Verification gate: 11/11 pass