Files
scadalink-design/docs/plans
Joseph Doherty 552c9e4065 docs(templates): record phase 4-9 completion + verification TODOs
All nine derive-on-compose phases are now implemented. The status doc
captures what shipped per phase, what was deferred (LockedInDerived
override warning toast, SCADA008 base-Parent hint), and the live-DB /
UI smoke checks worth running before merge.
2026-05-12 08:59:19 -04:00
..