Remove the LmxProxy work package (WP-8) from phase-3b, the CD-DCL-1..6 protocol details, Q9/Q-P3B-2 from the questions log, the LmxProxy component-design rows in requirements-traceability, and the inline mentions across phase-0, phase-4, the gRPC streaming plans, and the primary/backup data-connection plans.