Files
scadalink-design/docs/plans
Joseph Doherty 021817930b Generate all 11 phase implementation plans with bullet-level requirement traceability
All phases (0-8) now have detailed implementation plans with:
- Bullet-level requirement extraction from HighLevelReqs sections
- Design constraint traceability (KDD + Component Design)
- Work packages with acceptance criteria mapped to every requirement
- Split-section ownership verified across phases
- Orphan checks (forward, reverse, negative) all passing
- Codex MCP (gpt-5.4) external verification completed per phase

Total: 7,549 lines across 11 plan documents, ~160 work packages,
~400 requirements traced, ~25 open questions logged for follow-up.
2026-03-16 15:34:54 -04:00
..