Commit Graph

2 Commits

Author SHA1 Message Date
Joseph Doherty
b659978764 Phase 8: Production readiness — failover tests, security hardening, sandboxing, deployment docs
- WP-1-3: Central/site failover + dual-node recovery tests (17 tests)
- WP-4: Performance testing framework for target scale (7 tests)
- WP-5: Security hardening (LDAPS, JWT key length, no secrets in logs) (11 tests)
- WP-6: Script sandboxing adversarial tests (28 tests, all forbidden APIs)
- WP-7: Recovery drill test scaffolds (5 tests)
- WP-8: Observability validation (structured logs, correlation IDs, metrics) (6 tests)
- WP-9: Message contract compatibility (forward/backward compat) (18 tests)
- WP-10: Deployment packaging (installation guide, production checklist, topology)
- WP-11: Operational runbooks (failover, troubleshooting, maintenance)
92 new tests, all passing. Zero warnings.
2026-03-16 22:12:31 -04:00
Joseph Doherty
8c2091dc0a Phase 0 WP-0.10–0.12: Host skeleton, options classes, sample configs, and execution framework
- WP-0.10: Role-based Host startup (Central=WebApplication, Site=generic Host),
  15 component AddXxx() extension methods, MapCentralUI/MapInboundAPI stubs
- WP-0.11: 12 per-component options classes with config binding
- WP-0.12: Sample appsettings for central and site topologies
- Add execution procedure and checklist template to generate_plans.md
- Add phase-0-checklist.md for execution tracking
- Resolve all 21 open questions from plan generation
- Update IDataConnection with batch ops and IAsyncDisposable
57 tests pass, zero warnings.
2026-03-16 18:59:07 -04:00