39a3ca3347 docs(audit): expand M2-M8 to full TDD-detail tasks
Per user request: every milestone now carries bite-sized TDD tasks
(write failing test -> run failing -> implement -> run passing -> commit),
matching M1's density. Each task lists exact file paths, numbered steps,
and a commit message.

Task counts per milestone:
- M1 Foundation: 11
- M2 Site pipeline (sync-only): 12
- M3 Cached operations + dual-write (inlines #22 + cached-call tracking): 18
- M4 Remaining boundary emission: 12
- M5 Payload + redaction policy: 10
- M6 Reconciliation, purge, partition maintenance, metrics: 12
- M7 Central UI: 16
- M8 CLI: 9
Total: ~100 bite-sized tasks.

The roadmap remains the contract; per-milestone execution still goes
through brainstorm -> writing-plans -> subagent-driven-development to
produce a milestone-specific .tasks.json. Tasks in this roadmap will
shift slightly as M1 reveals codebase realities; treat them as the
intended shape rather than immutable IDs.
2026-05-20 09:32:59 -04:00
Joseph Doherty
d3d4a5b13d docs(audit): add 8-milestone code implementation roadmap
Roadmap covering Audit Log (#23) code implementation across 8 milestones
(M1 Foundation → M8 CLI). Reflects the actual state of the codebase —
all 22 prior components have source + tests, but Site Call Audit (#22)
and cached-call tracking are design-only despite being on main; their
minimum surface is inlined into M3.

M1 is laid out at full TDD-level task detail (11 bite-sized tasks).
M2–M8 are at milestone-shape detail (goals, files, task headlines,
acceptance criteria, risk callouts). Per-milestone bite-sized plans
will be generated by brainstorm + writing-plans when each milestone is
about to execute — locking 80 task cards now would mostly be stale by
M5 as M1 reveals codebase realities.

Critical path: M1 → M2 → (M3 ∥ M4 ∥ M5) → M6 → (M7 ∥ M8).

Spec: docs/requirements/Component-AuditLog.md + alog.md (commit
fec0bb1).