docs(audit): add /goal prompt for autonomous milestone execution
Self-contained prompt to drive M1..M8 execution against the roadmap. Embeds the per-milestone loop: branch -> brainstorm -> writing-plans -> subagent-driven-development -> verify (tests gate) -> merge --no-ff -> update downstream roadmap sections with realities learned -> proceed. Honors the user-memory feedback (bundling cadence, UI rules, form layout, recommendations-first) and the locked invariants (prose anchors not §N, CachedCallTelemetry not CachedOperationTelemetry, audit failures never abort actions, append-only, ForwardState purge invariant, no push, v1.x features stay deferred). Termination criteria are explicit.
This commit is contained in:
144
docs/plans/audit-log-goal-prompt.md
Normal file
144
docs/plans/audit-log-goal-prompt.md
Normal file
@@ -0,0 +1,144 @@
|
|||||||
|
# Audit Log (#23) — /goal Prompt
|
||||||
|
|
||||||
|
Self-contained prompt to drive autonomous execution of the Audit Log
|
||||||
|
implementation from `docs/plans/2026-05-20-audit-log-code-roadmap.md`.
|
||||||
|
|
||||||
|
**Usage:** copy the fenced block below and paste into `/goal` in this repo.
|
||||||
|
Each milestone executes, ships to `main`, then updates downstream roadmap
|
||||||
|
sections with realities learned before starting the next milestone.
|
||||||
|
|
||||||
|
If your `/goal` environment doesn't pre-load skill identifiers, replace
|
||||||
|
`superpowers-extended-cc:brainstorming` (and similar) with whatever
|
||||||
|
invocation form is correct. The workflow is the same.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
```
|
||||||
|
GOAL: Implement the ScadaLink Audit Log component (#23) end-to-end against
|
||||||
|
the existing codebase by executing all 8 milestones from the roadmap at
|
||||||
|
docs/plans/2026-05-20-audit-log-code-roadmap.md. After each milestone ships
|
||||||
|
to main, update the remaining milestones in the roadmap with what was
|
||||||
|
actually learned. Done when M8 is merged and the full test suite is green.
|
||||||
|
|
||||||
|
═══════ STARTING STATE ═══════
|
||||||
|
Repo: /Users/dohertj2/Desktop/scadalink-design
|
||||||
|
Starting ref: main at 39a3ca3
|
||||||
|
Spec (immut.): alog.md (commit fec0bb1) + docs/requirements/Component-AuditLog.md
|
||||||
|
Roadmap: docs/plans/2026-05-20-audit-log-code-roadmap.md (8 milestones, ~100 tasks)
|
||||||
|
Working tree: 3 infra/* modifications are PRE-EXISTING and UNRELATED.
|
||||||
|
Never touch them. Use explicit `git add <path>`; never `commit -am`.
|
||||||
|
|
||||||
|
User-memory feedback to honor (under ~/.claude/projects/<this>/memory/):
|
||||||
|
• feedback_subagent_cadence.md — bundle small adjacent tasks per milestone
|
||||||
|
• feedback_central_ui.md — Blazor Server + Bootstrap only, no 3rd-party frameworks
|
||||||
|
• feedback_form_layout.md — vertical stack, read-only first, buttons at bottom
|
||||||
|
• feedback_recommendations.md — lead with a recommended option
|
||||||
|
|
||||||
|
═══════ INVARIANTS (never violate) ═══════
|
||||||
|
1. Cross-refs to Component-AuditLog.md use PROSE anchors (e.g., "Payload
|
||||||
|
Capture Policy"), NEVER `§N`. § only exists in alog.md.
|
||||||
|
2. CachedCallTelemetry is the correct message name. CachedOperationTelemetry
|
||||||
|
does not exist — never introduce it.
|
||||||
|
3. Audit-write failures NEVER abort user-facing actions anywhere — ESG calls,
|
||||||
|
DB writes, Inbound API requests, Notify dispatches all continue normally
|
||||||
|
if the audit append throws.
|
||||||
|
4. AuditLog is strictly append-only at central. No UPDATE. No row-level
|
||||||
|
DELETE. Purge is partition-switch only.
|
||||||
|
5. Site SQLite purge requires ForwardState ∈ {Forwarded, Reconciled}; pending
|
||||||
|
rows are never age-purged.
|
||||||
|
6. Do NOT push to origin. Never. Merges to main are local-only.
|
||||||
|
7. Hash-chain tamper-evidence and Parquet archival are deferred to v1.x.
|
||||||
|
Do not implement them. Per-channel retention overrides also deferred.
|
||||||
|
|
||||||
|
═══════ PER-MILESTONE LOOP (M1 → M8) ═══════
|
||||||
|
For each milestone N from 1 to 8, in order:
|
||||||
|
|
||||||
|
A. BRANCH
|
||||||
|
git switch -c feature/audit-log-m{N}-<slice> from main.
|
||||||
|
|
||||||
|
B. BRAINSTORM
|
||||||
|
Invoke `superpowers-extended-cc:brainstorming` to nail any code-level
|
||||||
|
decisions not fixed by the spec or roadmap (test-fixture placement,
|
||||||
|
exact dispatcher names, helper signatures, etc.). One question at a
|
||||||
|
time, recommended option first.
|
||||||
|
|
||||||
|
C. WRITING-PLANS
|
||||||
|
Invoke `superpowers-extended-cc:writing-plans` to turn the milestone's
|
||||||
|
roadmap section into a milestone-specific executable plan at
|
||||||
|
docs/plans/2026-XX-XX-auditlog-m{N}-<slice>.md with peer .tasks.json.
|
||||||
|
Each task: exact file paths, TDD steps (failing test → impl → passing →
|
||||||
|
commit), commit message.
|
||||||
|
|
||||||
|
D. EXECUTE
|
||||||
|
Invoke `superpowers-extended-cc:subagent-driven-development`.
|
||||||
|
Per the cadence memory: bundle small adjacent tasks into one
|
||||||
|
implementer dispatch + one combined spec+quality reviewer per bundle.
|
||||||
|
Trivial 1–3 line fix-ups may be controller-direct edits; substantive
|
||||||
|
fixes go through a fresh implementer subagent. End each milestone with
|
||||||
|
a final cross-bundle reviewer over the whole branch.
|
||||||
|
|
||||||
|
E. VERIFY (gate — do not skip)
|
||||||
|
• Milestone-specific tests pass: dotnet test --filter <pattern>
|
||||||
|
• Full solution tests still pass: dotnet test ScadaLink.slnx
|
||||||
|
• Every acceptance criterion from the roadmap's M{N} section is met,
|
||||||
|
cited by name to the test that proves it.
|
||||||
|
• If anything is red, fix-loop. Never proceed with red tests.
|
||||||
|
|
||||||
|
F. MERGE
|
||||||
|
git switch main
|
||||||
|
git merge --no-ff feature/audit-log-m{N}-<slice> -m "<summary>"
|
||||||
|
No push.
|
||||||
|
|
||||||
|
G. UPDATE DOWNSTREAM ROADMAP (the novel step — do not skip)
|
||||||
|
Before starting M{N+1}, edit the M{N+1}..M8 sections of
|
||||||
|
docs/plans/2026-05-20-audit-log-code-roadmap.md to reflect realities
|
||||||
|
learned during M{N}:
|
||||||
|
• Correct any file paths that turned out different.
|
||||||
|
• Update class/method names that got renamed during M{N}.
|
||||||
|
• Add brief notes under affected later-milestone tasks pointing at
|
||||||
|
the actual helper / fixture / pattern used in M{N} that the next
|
||||||
|
milestone should reuse.
|
||||||
|
• Remove tasks that turned out unnecessary; add tasks that turned
|
||||||
|
out missing.
|
||||||
|
• Do NOT rewrite milestones wholesale — only update what M{N}
|
||||||
|
demonstrably changed.
|
||||||
|
Commit on main:
|
||||||
|
docs(audit): roadmap corrections after M{N}
|
||||||
|
|
||||||
|
H. STATUS UPDATE
|
||||||
|
Output one paragraph:
|
||||||
|
- Milestone N and slice name
|
||||||
|
- Commit SHA range merged to main
|
||||||
|
- Tests added / total passing
|
||||||
|
- Roadmap corrections summary (one line)
|
||||||
|
- Next milestone
|
||||||
|
|
||||||
|
I. PROCEED to M{N+1} (back to step A).
|
||||||
|
|
||||||
|
═══════ ASK THE USER BEFORE ═══════
|
||||||
|
• Implementing anything that contradicts the spec — flag the design gap,
|
||||||
|
let the user decide whether to fix the design first.
|
||||||
|
• Touching a file the user is editing in working tree (always check
|
||||||
|
`git status` first).
|
||||||
|
• Pulling a deferred v1.x feature into v1 scope.
|
||||||
|
• Pushing to origin (never push without explicit authorization).
|
||||||
|
• A milestone's acceptance criteria turn out unachievable as written.
|
||||||
|
|
||||||
|
═══════ TERMINATION ═══════
|
||||||
|
Done when ALL hold:
|
||||||
|
1. M8 merged to main.
|
||||||
|
2. `dotnet test ScadaLink.slnx` green (full solution).
|
||||||
|
3. `dotnet test tests/ScadaLink.IntegrationTests/` green.
|
||||||
|
4. Roadmap reflects what was actually shipped (corrections committed).
|
||||||
|
5. infra/* still untouched and uncommitted.
|
||||||
|
6. alog.md unchanged from fec0bb1 (or, if changed, the design correction
|
||||||
|
was committed BEFORE the affected code change — never the reverse).
|
||||||
|
7. Component-AuditLog.md unchanged unless a clarification was committed
|
||||||
|
first, same discipline.
|
||||||
|
|
||||||
|
═══════ START ═══════
|
||||||
|
Begin with M1: Foundation (schema, types, DB roles, partitioning).
|
||||||
|
The roadmap's M1 section is the source of truth for the task list. Read it
|
||||||
|
fully before doing anything else, then proceed through the per-milestone
|
||||||
|
loop. Build to ship; do not get clever; trust the design.
|
||||||
|
```
|
||||||
Reference in New Issue