Generated design docs and implementation plans via Codex for: - Batch 13: FileStore Read/Query - Batch 14: FileStore Write/Lifecycle - Batch 15: MsgBlock + ConsumerFileStore - Batch 18: Server Core - Batch 19: Accounts Core - Batch 20: Accounts Resolvers - Batch 21: Events + MsgTrace - Batch 22: Monitoring All plans include mandatory verification protocol and anti-stub guardrails. Updated batches.md with file paths and planned status.
This commit is contained in:
@@ -0,0 +1,156 @@
|
||||
# Batch 15 MsgBlock + ConsumerFileStore Design
|
||||
|
||||
I'm using `brainstorm` to produce this design before implementation planning.
|
||||
|
||||
## Context
|
||||
|
||||
- Batch: `15` (`MsgBlock + ConsumerFileStore`)
|
||||
- Dependency: Batch `14` (`FileStore Write/Lifecycle`)
|
||||
- Scope: `121` features + `89` tests
|
||||
- Go source: `golang/nats-server/server/filestore.go`
|
||||
- Current batch status: `pending` (all mapped features/tests currently `deferred`)
|
||||
|
||||
Observed with PortTracker:
|
||||
|
||||
- `batch show 15`: full feature/test inventory loaded from `server/filestore.go` and related tests.
|
||||
- `batch list`: Batch 15 depends on Batch 14.
|
||||
- `batch ready`: Batch 15 is not startable yet (dependency gate not satisfied).
|
||||
- `report summary`: overall porting progress is `1924/6942 (27.7%)`.
|
||||
|
||||
## Problem Statement
|
||||
|
||||
Batch 15 is the deepest part of FileStore internals: message block recovery/scanning, cache lifecycle, compaction/tombstones, disk rewrite/compression/encryption paths, and `ConsumerFileStore` state flushing. If this batch is implemented without strict verification discipline, downstream stream/consumer lifecycle batches will inherit correctness and durability bugs that are expensive to debug.
|
||||
|
||||
## Constraints and Success Criteria
|
||||
|
||||
- Do not start Batch 15 execution until Batch 14 is complete.
|
||||
- Keep implementation scoped to Batch 15 mapped IDs.
|
||||
- Enforce non-stub behavior for both production code and tests.
|
||||
- Promote statuses only with evidence-backed build/test proof.
|
||||
- If blocked, keep IDs deferred with explicit reasons; do not fake-pass.
|
||||
|
||||
Success for this batch means:
|
||||
|
||||
1. All implementable Batch 15 features are real C# ports with parity-oriented behavior.
|
||||
2. All implementable mapped tests are real behavioral tests and passing.
|
||||
3. Blocked items remain deferred with concrete, auditable reasons.
|
||||
4. Batch can pass final `batch complete 15` validation once dependencies are met and evidence is complete.
|
||||
|
||||
## Approaches Considered
|
||||
|
||||
### Approach 1 (Recommended): Vertical slices by feature groups and test waves
|
||||
|
||||
Split 121 features into seven groups (`20/20/20/20/20/20/1`) and execute each group with immediate build/test/status gates before moving on.
|
||||
|
||||
Pros:
|
||||
|
||||
- Contains risk in file-store concurrency code.
|
||||
- Makes regressions local and debuggable.
|
||||
- Supports strict anti-stub and evidence requirements.
|
||||
|
||||
Cons:
|
||||
|
||||
- More checkpoints and bookkeeping overhead.
|
||||
|
||||
### Approach 2: Feature-complete first, tests second
|
||||
|
||||
Implement all production features first, then port all tests.
|
||||
|
||||
Pros:
|
||||
|
||||
- Fewer context switches while coding.
|
||||
|
||||
Cons:
|
||||
|
||||
- Late detection of regressions.
|
||||
- Weak traceability for status updates.
|
||||
- Higher risk of last-minute stub behavior.
|
||||
|
||||
### Approach 3: Test-first broad wave with temporary placeholders
|
||||
|
||||
Attempt to satisfy test volume rapidly with minimal implementation placeholders.
|
||||
|
||||
Pros:
|
||||
|
||||
- Fast apparent progress.
|
||||
|
||||
Cons:
|
||||
|
||||
- Violates anti-stub requirement.
|
||||
- Creates false confidence and rework.
|
||||
- Unacceptable for durability-critical file store logic.
|
||||
|
||||
## Recommended Design
|
||||
|
||||
### 1) Implementation Topology
|
||||
|
||||
Primary code targets:
|
||||
|
||||
- `dotnet/src/ZB.MOM.NatsNet.Server/JetStream/MessageBlock.cs`
|
||||
- `dotnet/src/ZB.MOM.NatsNet.Server/JetStream/FileStore.cs`
|
||||
- `dotnet/src/ZB.MOM.NatsNet.Server/JetStream/FileStoreTypes.cs`
|
||||
- `dotnet/src/ZB.MOM.NatsNet.Server/JetStream/StoreTypes.cs`
|
||||
|
||||
Scope focus:
|
||||
|
||||
- `MessageBlock` internals (95 mapped features)
|
||||
- `ConsumerFileStore` internals (18 mapped features)
|
||||
- Store enum/codec helpers and error wrappers
|
||||
|
||||
### 2) Verification-First Control Plane
|
||||
|
||||
Every feature group and test wave must pass:
|
||||
|
||||
- Per-feature read/port/build/test loop
|
||||
- Stub scan gates (production + tests)
|
||||
- Build gate after each feature group
|
||||
- Related test gate before feature `verified`
|
||||
- Chunked status updates (`<=15` IDs/update)
|
||||
- Full checkpoint (`build + full test + commit`) between tasks
|
||||
|
||||
### 3) Test Strategy
|
||||
|
||||
Mapped tests are concentrated in:
|
||||
|
||||
- `JetStreamFileStoreTests.Impltests.cs` (58)
|
||||
- `JwtProcessorTests.Impltests.cs` (24)
|
||||
- `GatewayHandlerTests.Impltests.cs` (2)
|
||||
- `ConcurrencyTests1.Impltests.cs` (1)
|
||||
- `ConcurrencyTests2.Impltests.cs` (2)
|
||||
- `EventsHandlerTests.Impltests.cs` (1)
|
||||
- `ConfigReloaderTests.Impltests.cs` (1)
|
||||
|
||||
Design decision:
|
||||
|
||||
- Treat filestore/concurrency tests as primary verification for Batch 15 behavior.
|
||||
- Treat cross-module JWT/gateway/events/reload tests as dependency-sensitive; keep deferred with reasons if blocked by non-Batch-15 surfaces.
|
||||
|
||||
### 4) Data and Concurrency Parity Priorities
|
||||
|
||||
Highest-risk behavior areas to preserve from Go:
|
||||
|
||||
- Block rebuild and index/tombstone accounting integrity.
|
||||
- Cache ownership transitions and forced expiration races.
|
||||
- Flush loops and fsync boundaries for pending writes.
|
||||
- Compression/encryption conversion and checksum correctness.
|
||||
- Consumer state encode/encrypt/flush sequencing.
|
||||
|
||||
### 5) Status Governance
|
||||
|
||||
- Feature lifecycle: `deferred -> stub -> complete -> verified`
|
||||
- Test lifecycle: `deferred -> stub -> verified` (or `deferred` with blocker note)
|
||||
- Status updates require direct evidence references (Go line reviewed, build output, targeted test output, stub scan clean).
|
||||
|
||||
## Non-Goals
|
||||
|
||||
- Pulling in work from future stream/consumer lifecycle batches beyond mapped Batch 15 IDs.
|
||||
- Marking cross-module tests verified without executable evidence.
|
||||
- Using placeholder methods/tests to satisfy status transitions.
|
||||
|
||||
## Acceptance Criteria
|
||||
|
||||
- Batch 15 feature groups fully implemented with non-stub logic.
|
||||
- Mandatory verification protocol passed for each group/wave.
|
||||
- Evidence-backed status transitions applied in chunks of max 15 IDs.
|
||||
- Deferred items carry explicit blocker reasons.
|
||||
- Batch closure commands are expected to pass once dependency Batch 14 is complete.
|
||||