Commit Graph

3 Commits

Author SHA1 Message Date
Joseph Doherty eacdd2d453 fix(IPC-23,IPC-24,IPC-25,IPC-32): proto-comment regen wave + codegen-freshness guards
Proto comments (comment-only, no wire change):
- mxaccess_worker.proto GatewayHello.max_frame_bytes: every worker->gateway frame
  must serialize within the negotiated max; reply builders truncate (IPC-23).
- mxaccess_gateway.proto DrainEventsReply: count-cap + byte-cap, drain-until-empty
  caller contract (IPC-23).
- mxaccess_gateway.proto ReplayGap.oldest_available_sequence: empty-ring value is
  highest-observed+1, oldest-1 resume formula stays valid (GWC-25 deferred amendment).

Regen wave: Contracts/Generated (C# XML doc), rust vendored protos (byte-copy),
Go bindings (worker binding was genuinely stale - lacked MaxFrameBytes entirely),
Python worker _pb2 (real descriptor delta), Java aggregates (javadoc, zero
protobuf-version churn under the pinned toolchain), client descriptor set.

IPC-24: pinned Java toolchain regenerates with no gencode-version churn, so the
unconditional churn-revert step in ci.yml is a fossil - deleted it; git diff is
now a true message-level drift gate for the single-file Java aggregates.

IPC-25: pin protoc-gen-go v1.36.11 / protoc-gen-go-grpc 1.6.2 in the Go generate
script (+ fix a latent pwsh-7 parse bug); add Check 4 to check-codegen.ps1
(regenerate Go+Python bindings, fail on diff, tool-missing fails not skips); add
the pinned-generator installs to the portable CI job.

IPC-32: relabel check-codegen banners 1/4..4/4 (folded into the Check 4 edit).

Docs: ClientProtoGeneration.md, Contracts.md, GatewayTesting.md, build.gradle
checkGeneratedClean caveat. Tracking: IPC-23/24/25/32 -> Done, GWC-25 proto note
resolved, change-log 2026-08-07.
2026-08-07 07:41:18 -04:00
Joseph Doherty 33ba612ddd fix(WRK-21,WRK-28,WRK-23,IPC-30): byte-budget the DrainEvents reply, stop size errors from killing sessions
ci / nightly-windev (push) Has been skipped
ci / java (push) Successful in 2m8s
ci / portable (push) Successful in 7m41s
ci / windows-x86 (push) Failing after 12m32s
WRK-21 — DrainEvents was bounded by event count only, so a byte-heavy queue
(large string/array MxValues) built a reply above the negotiated frame maximum:
the writer rejected the frame, the exception unwound the session, and the events
already dequeued were destroyed. The drain is now byte-budgeted inside the queue
lock, so an event is dequeued only once it is known to fit and one that does not
stays at the head. Truncation is reported through the reply's existing
DiagnosticMessage (no contract change); callers drain until an empty reply. Both
reply-write seams — the control-command path and ProcessCommandAsync — now catch
MessageTooLarge and answer the correlation with an InvalidRequest reply instead
of unwinding or faulting the session. Satisfies IPC-23 R1-R3.

WRK-28 — the 10,000 drain ceiling moves to GatewayContractInfo
.MaxDrainEventsPerCommand, referenced by both the gateway request validator and
the worker clamp, replacing a comment-only sync contract. C# const only; no
.proto change.

WRK-23 — WorkerFrameWriter now peek-stamps, validates, then commits the sequence
counter immediately before the stream write, so a per-frame rejection leaves no
phantom gap on the wire.

IPC-30 — an oversized event frame stays session-fatal (it is undeliverable end to
end and neither dropping nor synthesizing a replacement is allowed), but the
death is structured: the event's identity and sizes are logged (never its value),
a WorkerFault with category PROTOCOL_VIOLATION and command method EventDrain is
written, then the session exits as before.

Docs updated in the same change: MxAccessWorkerInstanceDesign.md (drain byte cap,
truncation contract, oversized-head behavior, oversized-event policy, no control
reply is session-fatal on size), WorkerFrameProtocol.md (reply pre-sizing,
non-fatal reply-size rule, oversized-event policy, rejected frames do not consume
sequence numbers), gateway.md (DrainEvents two-axis bound).
2026-08-07 05:38:23 -04:00
Joseph Doherty 1a5a12a416 docs(archreview): 2026-07-12 follow-up review + remediation designs
ci / java (push) Successful in 1m54s
ci / portable (push) Successful in 7m6s
Six-domain re-review at the P2 merge (4f5371f): all prior Done claims
verified (none false, 10 partial), 47 new findings (1 High, 14 Medium),
with per-finding design/implementation plans and a new tracking register.
2026-07-13 00:18:38 -04:00