feat(ipc): negotiate worker frame max, add gRPC headroom, bound DrainEvents (IPC-02/03/04 gateway half)
Proto foundation + gateway-side of the size/backpressure pass: - IPC-02: add GatewayHello.max_frame_bytes (regen Generated/); gateway sends its negotiated worker-frame max in the handshake so the worker can adopt it instead of a hard-coded default. Worker read-half lands separately. - IPC-03: give the pipe frame max envelope-overhead headroom above the public gRPC cap (WorkerFrameProtocolOptions.EnvelopeOverheadReserveBytes = 64 KiB; default Worker.MaxMessageBytes bumped to 16 MiB + reserve), cross-validate the headroom at startup, and pre-check command envelope size in WorkerClient so an oversized command fails only that correlation (ResourceExhausted) instead of faulting the whole session. - IPC-04: reject DrainEvents max_events above a public ceiling in the request validator (worker per-reply cap lands with the worker half). Docs: GatewayConfiguration, WorkerFrameProtocol, gateway.md. Tests: headroom validation, DrainEvents bound, oversized-command per-command failure (pipe-harness, verified on windev).
This commit is contained in:
@@ -38,7 +38,7 @@
|
||||
"ShutdownTimeoutSeconds": 10,
|
||||
"HeartbeatIntervalSeconds": 5,
|
||||
"HeartbeatGraceSeconds": 15,
|
||||
"MaxMessageBytes": 16777216
|
||||
"MaxMessageBytes": 16842752
|
||||
},
|
||||
"Sessions": {
|
||||
"DefaultCommandTimeoutSeconds": 30,
|
||||
|
||||
Reference in New Issue
Block a user