feat(ipc): negotiate worker frame max, add gRPC headroom, bound DrainEvents (IPC-02/03/04 gateway half)
Proto foundation + gateway-side of the size/backpressure pass: - IPC-02: add GatewayHello.max_frame_bytes (regen Generated/); gateway sends its negotiated worker-frame max in the handshake so the worker can adopt it instead of a hard-coded default. Worker read-half lands separately. - IPC-03: give the pipe frame max envelope-overhead headroom above the public gRPC cap (WorkerFrameProtocolOptions.EnvelopeOverheadReserveBytes = 64 KiB; default Worker.MaxMessageBytes bumped to 16 MiB + reserve), cross-validate the headroom at startup, and pre-check command envelope size in WorkerClient so an oversized command fails only that correlation (ResourceExhausted) instead of faulting the whole session. - IPC-04: reject DrainEvents max_events above a public ceiling in the request validator (worker per-reply cap lands with the worker half). Docs: GatewayConfiguration, WorkerFrameProtocol, gateway.md. Tests: headroom validation, DrainEvents bound, oversized-command per-command failure (pipe-harness, verified on windev).
This commit is contained in:
@@ -946,6 +946,7 @@ public sealed class MxAccessGatewayService(
|
||||
WorkerClientErrorCode.GatewayShutdown => StatusCode.Cancelled,
|
||||
WorkerClientErrorCode.InvalidState => StatusCode.FailedPrecondition,
|
||||
WorkerClientErrorCode.ProtocolViolation => StatusCode.Internal,
|
||||
WorkerClientErrorCode.CommandTooLarge => StatusCode.ResourceExhausted,
|
||||
_ => StatusCode.Unavailable,
|
||||
};
|
||||
|
||||
|
||||
Reference in New Issue
Block a user