chore(plans): tasks 13-14 complete; as-built note on the hub-connection-factory removal
ci / nightly-windev (push) Has been skipped
ci / windows-x86 (push) Failing after 25s
ci / java (push) Successful in 2m18s
ci / portable (push) Successful in 9m2s

This commit is contained in:
Joseph Doherty
2026-08-16 04:22:34 -04:00
parent 7cfb2e727d
commit a37c304f26
2 changed files with 4 additions and 4 deletions
@@ -13,8 +13,8 @@
{ "id": 10, "subject": "Task 10: Control-frame completion decoupling in WorkerFrameWriter", "status": "completed", "blockedBy": [9] },
{ "id": 11, "subject": "Task 11: Worker pipe-read teardown — dispose-to-unblock and observe", "status": "completed", "blockedBy": [9] },
{ "id": 12, "subject": "Task 12: Value-cache clone removal per the aliasing audit", "status": "completed", "blockedBy": [9] },
{ "id": 13, "subject": "Task 13: Phase B gate — windev full verification", "status": "pending", "blockedBy": [10, 11, 12] },
{ "id": 14, "subject": "Task 14: Wrap-up — deferred table closure, docs sweep, final review", "status": "pending", "blockedBy": [13] }
{ "id": 13, "subject": "Task 13: Phase B gate — windev full verification", "status": "completed", "blockedBy": [10, 11, 12] },
{ "id": 14, "subject": "Task 14: Wrap-up — deferred table closure, docs sweep, final review", "status": "completed", "blockedBy": [13] }
],
"lastUpdated": "2026-08-15T00:00:00Z"
"lastUpdated": "2026-08-16T00:00:00Z"
}