fix(WRK-22,WRK-24,WRK-25,WRK-27,IPC-26): worker write-seam hardening
WRK-22/IPC-26: tombstone a WriteAsync/WriteBatchAsync cancelled while waiting for the write lock (PendingFrame.Claimed under _gate; DequeueNext skips cancelled, claims the frame it returns) so a cancelled write never reaches the wire unless already claimed mid-write (documented residual). WRK-25: add WriteBatchAsync; RunEventDrainLoopAsync submits the drained event batch through it, so a burst of N events costs one flush not N. IPC-30 oversized-event structured fault preserved via FindOversizedEvent. WRK-24: reject a below-1024 negotiated frame maximum at the handshake (MinNegotiableFrameBytes, matching GatewayOptionsValidator floor). WRK-27: alarm poll advertises StaCallInProgress on the heartbeat snapshot so the watchdog suppresses to the ceiling, not the grace. Docs (WorkerFrameProtocol.md, MxAccessWorkerInstanceDesign.md) and the 2026-07-12 remediation registers/change-log updated in the same commit.
This commit is contained in:
@@ -15,7 +15,7 @@ All `path:line` citations were re-verified against the working tree at `4f5371f`
|
||||
| IPC-23 | Medium | P0 | S¹ | WRK-21 | In progress — mechanics landed with WRK-21; proto-comment/doc wave pending | DrainEvents bound is count-based only; byte-heavy queue still builds a session-killing reply frame (contract requirements here; fix mechanics in WRK-21) |
|
||||
| IPC-24 | Medium | P0 | S | — | Not started | CI's unconditional Java churn-revert masks real generated-code drift for message-level proto changes |
|
||||
| IPC-25 | Medium | P0 | M | — | Not started | Committed Go/Python worker bindings are stale at HEAD; no guard covers them |
|
||||
| IPC-26 | Low | P2 | S¹ | WRK-22 | Not started | Cancelled write leaves a ghost frame that is still written (contract requirement here; fix mechanics in WRK-22) |
|
||||
| IPC-26 | Low | P2 | S¹ | WRK-22 | Done (mechanics landed in WRK-22) | Cancelled write leaves a ghost frame that is still written (contract requirement here; fix mechanics in WRK-22) |
|
||||
| IPC-27 | Low | P2 | S | — | Not started | Descriptor freshness test blind to enums, enum values, services/methods, and the Galaxy contract |
|
||||
| IPC-28 | Low | — | S | — | Done | `docs/Grpc.md` omits the `CommandTooLarge` → `ResourceExhausted` mapping |
|
||||
| IPC-29 | Low | — | S | — | Done (discharged by WRK-26) | Worker writer priority scheduling and write-time sequence stamping undocumented in the frame-protocol doc |
|
||||
|
||||
Reference in New Issue
Block a user