Merge feat/tst-24-client-wire-tests: .NET/Python real-server wire tests, Python channel-loop fix, TST-05 revisit (partial)
# Conflicts: # archreview/remediation/00-tracking.md
This commit is contained in:
@@ -150,7 +150,7 @@ Sequence these together rather than piecemeal — several are one change set spa
|
||||
|
||||
- Close **CLI-24** and **CLI-34** as `Done` (incidentally fixed; evidence in [../50-clients.md](../50-clients.md)).
|
||||
- ~~When CLI-38 lands, close old **CLI-08** with a pointer here.~~ Done 2026-08-07: CLI-38 landed and old CLI-08 is now `Done` in the first-cycle tracker, pointing at [CLI-38](50-clients.md#cli-38--align-netgojava-on-hresult--0-lands-prior-cli-08-cures-the-doc-drift---medium--p1).
|
||||
- ~~When WRK-26 lands, its doc section also discharges the WorkerFrameProtocol gap~~ Done 2026-08-07: WRK-26 landed and **IPC-29** is discharged, pointing at [WRK-26](20-worker.md#wrk-26--write-priority-and-overflow-doc-drift-from-the-wrk-07-change---low--p1). When TST-25 lands, revisit old **TST-05** (scheduled live smoke) and **TST-24** (client wire tests), which it unlocks.
|
||||
- ~~When WRK-26 lands, its doc section also discharges the WorkerFrameProtocol gap~~ Done 2026-08-07: WRK-26 landed and **IPC-29** is discharged, pointing at [WRK-26](20-worker.md#wrk-26--write-priority-and-overflow-doc-drift-from-the-wrk-07-change---low--p1). ~~When TST-25 lands, revisit old **TST-05** (scheduled live smoke) and **TST-24** (client wire tests), which it unlocks.~~ TST-05 revisited 2026-08-10: `Partially done` in the first-cycle tracker — the `nightly-windev` job closes the scheduled-cadence half, but the finding's coverage-audit half stays open (the live suite reaches all six late-added COM commands and none of the five control commands). TST-24 revisited in the same change and closed `Done`: Go/Rust/Java already had real-server wire tests, and the two genuine gaps (.NET, Python) now have them plus a CI step.
|
||||
|
||||
## Change log
|
||||
|
||||
|
||||
Reference in New Issue
Block a user