Produces docs/plans/ entries for tasks #13, #15, #16, and #17-#20: - phase-6-3-redundancy-interop-plan.md: automation boundary analysis, concrete test matrix (A/B/C blocks), and a step-by-step cutover runbook for the deferred Stream F client interop work - v2-ga-lab-gates-plan.md: exact gate list with command, pass criterion, and owner for each of the nine v2 GA exit criteria - live-hardware-validation-runbooks.md: one runbook per driver (FOCAS CNC smoke #54, AB CIP live-boot, TwinCAT wire-live) with preconditions, procedure, expected results, and recording template - alarms-worker-wiring-plan.md: focused plan for A.2/A.3-A.4/C.1/D.1 worker wiring in the mxaccessgw sibling repo, documenting the discovered AVEVA API surface, the architectural decision that blocks A.2, the dependency order, and what each item needs to unblock Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>