ba42967943
PR #94 closed the Phase 6.2 dispatch wiring blocker. Update the dashboard: - Status line: "two of three release blockers remain". - Release-blocker #1 section struck through + marked CLOSED with PR link. Remaining Stream C surfaces (Browse / Subscribe / Alarm / Call + finer- grained scope resolution) downgraded to hardening follow-ups — not release-blocking. - Change log: new dated entry. Two remaining blockers: Phase 6.1 Stream D config-cache wiring (task #136) + Phase 6.3 Streams A/C/F redundancy runtime (tasks #145, #147, #150). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>