Files
lmxopcua/tests
Joseph Doherty 5cfbe8b5dd test(host): deploy happy-path + idempotency integration tests (Task 59)
DeployHappyPathTests exercises the full deploy pipeline on the 2-node harness:
AdminOperationsActor → ConfigPublishCoordinator → DistributedPubSub →
DriverHostActor on both nodes → ApplyAck → coordinator seals. Verifies both
NodeDeploymentState rows reach Applied and Deployment.Status reaches Sealed.

Exposed + fixed two production bugs along the way:

1. Coordinator was publishing DispatchDeployment on the "deployments" topic but
   never subscribed to anything — DriverHostActor ACKs published on the same
   topic could not reach it. Added dedicated "deployment-acks" topic with
   coordinator subscription in PreStart, and DriverHostActor publishes ACKs
   there.

2. NodeId derivation used member.Address.Host only — two cluster members on a
   shared loopback host (test harness, dev VMs) collided to one identity. The
   coordinator's expected-ack set became {1} and the system sealed after only
   half the nodes acked. Switched to host:port everywhere (ClusterRoleInfo +
   coordinator) so loopback nodes stay distinct and production identities are
   harmlessly more specific.

Tests: 95 v2 tests pass (was 93 + 2 deploy tests), 0 skipped.

Failover scenarios (design §8 cases 3-7: node-kill-mid-apply, split-brain,
restart-during-deploy) deferred — they need controlled node-down primitives
on the harness. Tracked as F22 (failover scenario test cases).
2026-05-26 06:34:36 -04:00
..