Joseph Doherty 592fa79e3c Add Phase 0 + Phase 1 detailed implementation plans under docs/v2/implementation/ with a phase-gate model so the work can be verified for compliance to the v2 design as it lands. Three-gate structure per phase (entry / mid / exit) with explicit compliance-check categories: schema compliance (live DB introspected against config-db-schema.md DDL via xUnit), decision compliance (every decision number cited in the phase doc must have at least one code/test citation in the codebase, verified via git grep), visual compliance (Admin UI screenshots reviewed side-by-side against ScadaLink CentralUI's equivalent screens), behavioral compliance (per-phase end-to-end smoke test that always passes at exit, never "known broken fix later"), stability compliance (cross-cutting protections from driver-stability.md wired up and regression-tested for Tier C drivers), and documentation compliance (any deviation from v2 design docs reflected back as decision-log updates with explicit "supersedes" notes). Exit gate requires two-reviewer signoff and an exit-gate-{phase}.md record; silent deviation is the failure mode the gates exist to make impossible to ship. Phase 0 doc covers the mechanical LmxOpcUa → OtOpcUa rename with 9 tasks, 7 compliance checks, and a completion checklist that gates on baseline test count parity. Phase 1 doc covers the largest greenfield phase — 5 work streams (Core.Abstractions, Configuration project with EF Core schema + stored procs + LiteDB cache + generation-diff applier, Core with GenericDriverNodeManager rename + IAddressSpaceBuilder + driver isolation, Server with Microsoft.Extensions.Hosting replacing TopShelf + credential-bound bootstrap, Admin Blazor Server app mirroring ScadaLink CentralUI verbatim with LDAP cookie auth + draft/diff/publish workflow + UNS structure management + equipment CRUD + release-reservation and merge-equipment operator flows) — with task-level acceptance criteria, a 14-step end-to-end smoke test, and decision citation requirements for #1-125. New decisions #126-127 capture the gate model and per-phase doc structure. Cross-references added to plan.md Reference Documents section.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-17 11:25:09 -04:00
..
Add Phase 0 + Phase 1 detailed implementation plans under docs/v2/implementation/ with a phase-gate model so the work can be verified for compliance to the v2 design as it lands. Three-gate structure per phase (entry / mid / exit) with explicit compliance-check categories: schema compliance (live DB introspected against config-db-schema.md DDL via xUnit), decision compliance (every decision number cited in the phase doc must have at least one code/test citation in the codebase, verified via git grep), visual compliance (Admin UI screenshots reviewed side-by-side against ScadaLink CentralUI's equivalent screens), behavioral compliance (per-phase end-to-end smoke test that always passes at exit, never "known broken fix later"), stability compliance (cross-cutting protections from driver-stability.md wired up and regression-tested for Tier C drivers), and documentation compliance (any deviation from v2 design docs reflected back as decision-log updates with explicit "supersedes" notes). Exit gate requires two-reviewer signoff and an exit-gate-{phase}.md record; silent deviation is the failure mode the gates exist to make impossible to ship. Phase 0 doc covers the mechanical LmxOpcUa → OtOpcUa rename with 9 tasks, 7 compliance checks, and a completion checklist that gates on baseline test count parity. Phase 1 doc covers the largest greenfield phase — 5 work streams (Core.Abstractions, Configuration project with EF Core schema + stored procs + LiteDB cache + generation-diff applier, Core with GenericDriverNodeManager rename + IAddressSpaceBuilder + driver isolation, Server with Microsoft.Extensions.Hosting replacing TopShelf + credential-bound bootstrap, Admin Blazor Server app mirroring ScadaLink CentralUI verbatim with LDAP cookie auth + draft/diff/publish workflow + UNS structure management + equipment CRUD + release-reservation and merge-equipment operator flows) — with task-level acceptance criteria, a 14-step end-to-end smoke test, and decision citation requirements for #1-125. New decisions #126-127 capture the gate model and per-phase doc structure. Cross-references added to plan.md Reference Documents section.
2026-04-17 11:25:09 -04:00
Add Phase 0 + Phase 1 detailed implementation plans under docs/v2/implementation/ with a phase-gate model so the work can be verified for compliance to the v2 design as it lands. Three-gate structure per phase (entry / mid / exit) with explicit compliance-check categories: schema compliance (live DB introspected against config-db-schema.md DDL via xUnit), decision compliance (every decision number cited in the phase doc must have at least one code/test citation in the codebase, verified via git grep), visual compliance (Admin UI screenshots reviewed side-by-side against ScadaLink CentralUI's equivalent screens), behavioral compliance (per-phase end-to-end smoke test that always passes at exit, never "known broken fix later"), stability compliance (cross-cutting protections from driver-stability.md wired up and regression-tested for Tier C drivers), and documentation compliance (any deviation from v2 design docs reflected back as decision-log updates with explicit "supersedes" notes). Exit gate requires two-reviewer signoff and an exit-gate-{phase}.md record; silent deviation is the failure mode the gates exist to make impossible to ship. Phase 0 doc covers the mechanical LmxOpcUa → OtOpcUa rename with 9 tasks, 7 compliance checks, and a completion checklist that gates on baseline test count parity. Phase 1 doc covers the largest greenfield phase — 5 work streams (Core.Abstractions, Configuration project with EF Core schema + stored procs + LiteDB cache + generation-diff applier, Core with GenericDriverNodeManager rename + IAddressSpaceBuilder + driver isolation, Server with Microsoft.Extensions.Hosting replacing TopShelf + credential-bound bootstrap, Admin Blazor Server app mirroring ScadaLink CentralUI verbatim with LDAP cookie auth + draft/diff/publish workflow + UNS structure management + equipment CRUD + release-reservation and merge-equipment operator flows) — with task-level acceptance criteria, a 14-step end-to-end smoke test, and decision citation requirements for #1-125. New decisions #126-127 capture the gate model and per-phase doc structure. Cross-references added to plan.md Reference Documents section.
2026-04-17 11:25:09 -04:00
Add Phase 0 + Phase 1 detailed implementation plans under docs/v2/implementation/ with a phase-gate model so the work can be verified for compliance to the v2 design as it lands. Three-gate structure per phase (entry / mid / exit) with explicit compliance-check categories: schema compliance (live DB introspected against config-db-schema.md DDL via xUnit), decision compliance (every decision number cited in the phase doc must have at least one code/test citation in the codebase, verified via git grep), visual compliance (Admin UI screenshots reviewed side-by-side against ScadaLink CentralUI's equivalent screens), behavioral compliance (per-phase end-to-end smoke test that always passes at exit, never "known broken fix later"), stability compliance (cross-cutting protections from driver-stability.md wired up and regression-tested for Tier C drivers), and documentation compliance (any deviation from v2 design docs reflected back as decision-log updates with explicit "supersedes" notes). Exit gate requires two-reviewer signoff and an exit-gate-{phase}.md record; silent deviation is the failure mode the gates exist to make impossible to ship. Phase 0 doc covers the mechanical LmxOpcUa → OtOpcUa rename with 9 tasks, 7 compliance checks, and a completion checklist that gates on baseline test count parity. Phase 1 doc covers the largest greenfield phase — 5 work streams (Core.Abstractions, Configuration project with EF Core schema + stored procs + LiteDB cache + generation-diff applier, Core with GenericDriverNodeManager rename + IAddressSpaceBuilder + driver isolation, Server with Microsoft.Extensions.Hosting replacing TopShelf + credential-bound bootstrap, Admin Blazor Server app mirroring ScadaLink CentralUI verbatim with LDAP cookie auth + draft/diff/publish workflow + UNS structure management + equipment CRUD + release-reservation and merge-equipment operator flows) — with task-level acceptance criteria, a 14-step end-to-end smoke test, and decision citation requirements for #1-125. New decisions #126-127 capture the gate model and per-phase doc structure. Cross-references added to plan.md Reference Documents section.
2026-04-17 11:25:09 -04:00