Joseph Doherty 1189dc87fd Close corrections-doc E2 (Aveva System Platform IO upstream-OPC-UA pattern verification) with GREEN-YELLOW verdict (decision #141) — AVEVA's OI Gateway communication driver is the documented path for AppServer to consume from arbitrary upstream OPC UA servers; multiple AVEVA partners (Software Toolbox, InSource) have published end-to-end integrations against four different non-AVEVA upstream servers (TOP Server, OPC Router, OmniServer, Cogent DataHub). No re-architecting of OtOpcUa required. Path: OPC UA node → OI Gateway → SuiteLink → $DDESuiteLinkDIObject → AppServer attribute. Recommended AppServer floor: System Platform 2023 R2 Patch 01.
OtOpcUa-side requirements all met or trivially met by v2: Basic256Sha256 + SignAndEncrypt + username token (transport security covers this), reject-and-trust cert workflow, endpoint URL must NOT include /discovery suffix (forum-documented failure mode), hostname-stable certs (decision #86 already enforces this since clients pin trust to ApplicationUri), OI Gateway service must NOT run under SYSTEM (deployment-guide concern). Two integrator-burden risks tracked: validation/GxP paperwork (no AVEVA blueprint exists for non-AVEVA upstream servers in Part 11 deployments — engage QA/regulatory in Year 1) and unpublished scale benchmarks (in-house benchmark required in Year 2 before cutover scheduling).

Phase 1 acceptance gains Task E.10 (decision #142): end-to-end AppServer-via-OI-Gateway smoke test against a Phase 1 OtOpcUa instance, catching AppServer-specific quirks (cert exchange, endpoint URL handling, service account, security mode combo) well before the Year 3 tier-3 cutover schedule. Non-blocking for Phase 1 exit if it surfaces only documentation-level fixes; blocking if it surfaces architectural incompatibility.

New file `docs/v2/aveva-system-platform-io-research.md` captures the full research with all source citations (AVEVA docs, Communications Drivers Pack readmes, Software Toolbox / InSource partner walkthroughs, Inductive Automation forum failure-mode reports). Plan.md decision log gains #141 and #142; Reference Documents section links the new doc.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-17 13:27:13 -04:00
..
Add Phase 0 + Phase 1 detailed implementation plans under docs/v2/implementation/ with a phase-gate model so the work can be verified for compliance to the v2 design as it lands. Three-gate structure per phase (entry / mid / exit) with explicit compliance-check categories: schema compliance (live DB introspected against config-db-schema.md DDL via xUnit), decision compliance (every decision number cited in the phase doc must have at least one code/test citation in the codebase, verified via git grep), visual compliance (Admin UI screenshots reviewed side-by-side against ScadaLink CentralUI's equivalent screens), behavioral compliance (per-phase end-to-end smoke test that always passes at exit, never "known broken fix later"), stability compliance (cross-cutting protections from driver-stability.md wired up and regression-tested for Tier C drivers), and documentation compliance (any deviation from v2 design docs reflected back as decision-log updates with explicit "supersedes" notes). Exit gate requires two-reviewer signoff and an exit-gate-{phase}.md record; silent deviation is the failure mode the gates exist to make impossible to ship. Phase 0 doc covers the mechanical LmxOpcUa → OtOpcUa rename with 9 tasks, 7 compliance checks, and a completion checklist that gates on baseline test count parity. Phase 1 doc covers the largest greenfield phase — 5 work streams (Core.Abstractions, Configuration project with EF Core schema + stored procs + LiteDB cache + generation-diff applier, Core with GenericDriverNodeManager rename + IAddressSpaceBuilder + driver isolation, Server with Microsoft.Extensions.Hosting replacing TopShelf + credential-bound bootstrap, Admin Blazor Server app mirroring ScadaLink CentralUI verbatim with LDAP cookie auth + draft/diff/publish workflow + UNS structure management + equipment CRUD + release-reservation and merge-equipment operator flows) — with task-level acceptance criteria, a 14-step end-to-end smoke test, and decision citation requirements for #1-125. New decisions #126-127 capture the gate model and per-phase doc structure. Cross-references added to plan.md Reference Documents section.
2026-04-17 11:25:09 -04:00