09af8d2830
Audits every Phase 7 plan stream (A-H) against the repo, confirms the exit gate is fully closed, and records the five genuine remaining gaps: OPC UA method-call dispatch for alarm Ack/Confirm/Shelve, the /virtual-tags and /scripted-alarms Admin UI tabs, the script log viewer, and the missing production IHistoryWriter for virtual-tag historization. Also notes that docs/v2/v2-release-readiness.md carries a stale "out of scope" label — Phase 7 shipped completely after that doc was last updated. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>