Audits every Phase 7 plan stream (A-H) against the repo, confirms the
exit gate is fully closed, and records the five genuine remaining gaps:
OPC UA method-call dispatch for alarm Ack/Confirm/Shelve, the
/virtual-tags and /scripted-alarms Admin UI tabs, the script log viewer,
and the missing production IHistoryWriter for virtual-tag historization.
Also notes that docs/v2/v2-release-readiness.md carries a stale "out of
scope" label — Phase 7 shipped completely after that doc was last updated.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>