# Whole-solution CI The `v2-ci` workflow restores, builds and tests in one job so the test step uses that job's Release binaries. Restore disables parallel package work; restore and build use at most two MSBuild workers. Testing uses one MSBuild worker, disables parallel target-framework runs and loads `ci.runsettings`: one VSTest process and two xUnit collection workers with conservative scheduling. Assemblies that disable parallelization keep that setting. The workflow retains the E2E/LiveIntegration exclusions, includes SlowUnit, keeps Akka's test time factor at three, and requires at least 12,000 executed tests. Runner capacity and TRX files remain available for diagnosing failures. These limits reduce contention; they do not prove every timing failure has one cause. There are no automatic test retries or changed assertion deadlines. Gitea 1.26 supports the repository-wide `lmxopcua-v2-ci` concurrency group. Only one run is active; an active run is not cancelled, but a newer pending run may supersede an older pending run. The group does not serialize other repositories using the same host. To reproduce the bounded test leg after restore and Release build: ```bash AKKA_TEST_TIMEFACTOR=3 dotnet test ZB.MOM.WW.OtOpcUa.slnx \ --configuration Release --no-build -m:1 -p:TestTfmsInParallel=false \ --settings scripts/ci/ci.runsettings \ --filter "Category!=E2E&Category!=LiveIntegration" \ --logger trx --results-directory artifacts/trx MIN_EXECUTED=12000 bash scripts/ci/assert-not-all-skipped.sh artifacts/trx/*.trx ```