# Phase 1 — Entry Gate Record **Phase**: 1 — Configuration project + Core.Abstractions + Admin scaffold **Branch**: `phase-1-configuration` **Date**: 2026-04-17 **Implementation lead**: Claude (executing on behalf of dohertj2) ## Entry conditions | Check | Required | Actual | Pass | |-------|----------|--------|------| | Phase 0 exit gate cleared | Rename complete, all v1 tests pass under OtOpcUa names | Phase 0 merged to `v2` at commit `45ffa3e` | ✅ | | `v2` branch is clean | Clean | Clean post-merge | ✅ | | Phase 0 PR merged | — | Merged via `--no-ff` to v2 | ✅ | | SQL Server 2019+ instance available | For development | NOT YET AVAILABLE — see deviation below | ⚠️ | | LDAP/GLAuth dev instance available | For Admin auth integration testing | Existing v1 GLAuth at `C:\publish\glauth\` | ✅ | | ScadaLink CentralUI source accessible | For parity reference | `C:\Users\dohertj2\Desktop\scadalink-design\` per memory | ✅ | | Phase 1-relevant design docs reviewed | All read by impl lead | ✅ Read in preceding sessions | ✅ | | Decisions read | #1–142 covered cumulatively | ✅ | ✅ | ## Deviation: SQL Server dev instance not yet stood up The Phase 1 entry gate requires a SQL Server 2019+ dev instance for the `Configuration` project's EF Core migrations + tests. This is per `dev-environment.md` Step 1, which is currently TODO. **Decision**: proceed with **Stream A only** (Core.Abstractions) in this continuation. Stream A has zero infrastructure dependencies — it's a `.NET 10` project with BCL-only references defining capability interfaces and DTOs. Streams B (Configuration), C (Core), D (Server), and E (Admin) all have infrastructure dependencies (SQL Server, GLAuth, Galaxy) and require the dev environment standup to be productive. The SQL Server standup is a one-line `docker run` per `dev-environment.md` §"Bootstrap Order — Inner-loop Developer Machine" step 5. It can happen in parallel with subsequent Stream A work but is not a blocker for Stream A itself. **This continuation will execute only Stream A.** Streams B–E require their own continuations after the dev environment is stood up. ## Phase 1 work scope (for reference) Per `phase-1-configuration-and-admin-scaffold.md`: | Stream | Scope | Status this continuation | |--------|-------|--------------------------| | **A. Core.Abstractions** | 11 capability interfaces + DTOs + DriverTypeRegistry | ▶ EXECUTING | | B. Configuration | EF Core schema, stored procs, LiteDB cache, generation-diff applier | DEFERRED — needs SQL Server | | C. Core | `LmxNodeManager → GenericDriverNodeManager` rename, `IAddressSpaceBuilder`, driver hosting | DEFERRED — depends on Stream A + needs Galaxy | | D. Server | `Microsoft.Extensions.Hosting` host, credential-bound bootstrap | DEFERRED — depends on Stream B | | E. Admin | Blazor Server scaffold mirroring ScadaLink | DEFERRED — depends on Stream B | ## Baseline metrics (carried from Phase 0 exit) - **Total tests**: 822 (pass + fail) - **Pass count**: 821 (improved from baseline 820 — one flaky test happened to pass at Phase 0 exit) - **Fail count**: 1 (the second pre-existing failure may flap; either 1 or 2 failures is consistent with baseline) - **Build warnings**: 30 (lower than original baseline 167) - **Build errors**: 0 Phase 1 must not introduce new failures or new errors against this baseline. ## Signoff Implementation lead: Claude (Opus 4.7) — 2026-04-17 Reviewer: pending — Stream A PR will require a second reviewer per overview.md exit-gate rules