Phase 6.4 exit gate - compliance real-checks + phase doc = SHIPPED (data layer) #92

Merged
dohertj2 merged 1 commits from phase-6-4-exit-gate into v2 2026-04-19 10:15:47 -04:00
Owner

Final PR for Phase 6.4 data-layer shipment.

Summary

  • 11 real compliance checks covering UnsImpactAnalyzer (DraftRevisionToken + cross-cluster reject + 3 move kinds) and EquipmentCsvImporter (version marker + decisions #117/#139 column sets + duplicate-ZTag + unknown-column rejection).
  • Four [DEFERRED] surfaces tracked: Stream A UI (#153), Stream B staging+finalize+UI (#155), Stream C DiffViewer (#156), Stream D OPC 40010 (#157).
  • Phase doc: SHIPPED (data layer) 2026-04-19.
  • Net: 1137 pre-6.4 → 1159 passing (+22).

Test plan

  • powershell.exe -File scripts/compliance/phase-6-4-compliance.ps1 exit 0.

🤖 Generated with Claude Code

Final PR for Phase 6.4 data-layer shipment. ## Summary - 11 real compliance checks covering UnsImpactAnalyzer (DraftRevisionToken + cross-cluster reject + 3 move kinds) and EquipmentCsvImporter (version marker + decisions #117/#139 column sets + duplicate-ZTag + unknown-column rejection). - Four `[DEFERRED]` surfaces tracked: Stream A UI (#153), Stream B staging+finalize+UI (#155), Stream C DiffViewer (#156), Stream D OPC 40010 (#157). - Phase doc: **SHIPPED (data layer)** 2026-04-19. - Net: 1137 pre-6.4 → 1159 passing (+22). ## Test plan - [x] `powershell.exe -File scripts/compliance/phase-6-4-compliance.ps1` exit 0. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
dohertj2 added 1 commit 2026-04-19 10:15:34 -04:00
scripts/compliance/phase-6-4-compliance.ps1 turns stub TODOs into 11 real
checks covering:
- Stream A data layer: UnsImpactAnalyzer + DraftRevisionToken + cross-cluster
  rejection (decision #82) + all three move kinds (LineMove / AreaRename /
  LineMerge).
- Stream B data layer: EquipmentCsvImporter + version marker
  '# OtOpcUaCsv v1' + decision-#117 required columns + decision-#139
  optional columns including DeviceManualUri + duplicate-ZTag rejection +
  unknown-column rejection.

Four [DEFERRED] surfaces tracked explicitly with task IDs:
  - Stream A UI drag/drop (task #153)
  - Stream B staging + finalize + UI (task #155)
  - Stream C DiffViewer refactor (task #156)
  - Stream D OPC 40010 Identification sub-folder + Razor component (task #157)

Cross-cutting: full solution dotnet test passes 1159 >= 1137 pre-Phase-6.4
baseline; pre-existing Client.CLI Subscribe flake tolerated.

docs/v2/implementation/phase-6-4-admin-ui-completion.md status updated from
DRAFT to SHIPPED (data layer). Four Blazor / SignalR / EF / address-space
follow-ups tracked as tasks — the visual-compliance review pattern from
Phase 6.1 Stream E applies to each.

`Phase 6.4 compliance: PASS` — exit 0.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
dohertj2 merged commit e1d38ecc66 into v2 2026-04-19 10:15:47 -04:00
Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: dohertj2/lmxopcua#92