Add a living progress tracker (docs/plans/2026-07-24-driver-expansion-tracking.md)
for the driver-expansion program's Waves 0-2, linked from the program design doc's
document map. One row per deliverable pointing at design + implementation plan + status.
Add executable implementation plans (plan .md + co-located .tasks.json) for the four
Wave 1/2 drivers, each authored by writing-plans methodology off its design doc and
mirroring the relevant existing driver:
- Modbus RTU 11 tasks (extends Driver.Modbus; RTU-over-TCP, direct-serial descoped)
- SQL poll 22 tasks (ISqlDialect seam, SQL Server only in v1; SQLite + central-SQL fixtures)
- MTConnect Agent 23 tasks (browse free via Wave-0 seam; TrakHound-vs-hand-rolled = Task 0)
- MQTT/Sparkplug B 27 tasks (P1 plain MQTT 0-14 then P2 Sparkplug 15-26; MQTTnet-5 pinning spike = Task 0)
Wave 0 (universal browser) remains merged (056887d6) with its live gate open (#468).
All four new plans are design-only -> plan-ready; nothing built yet.
Claude-Session: https://claude.ai/code/session_01GASWkNEi68FSCtvr6rLoEW