Commit Graph

1 Commits

Author SHA1 Message Date
Joseph Doherty
fac32ad69b docs(plans): add v2 implementation plan with 66 bite-sized tasks
Converts the akka-hosting-alignment design into an executable plan:
12 phases covering branch/scaffold, ConfigDb schema, Commons,
Cluster, Security, ControlPlane singletons, Runtime per-node actors,
OpcUaServer extraction, AdminUI migration, Host entry point, cleanup,
integration tests, deploy scripts, and docs. Each task has files,
TDD steps, exact commands, classification, time estimate, and
parallelizable list. Co-located .tasks.json drives executing-plans
resume from any session.
2026-05-26 03:17:29 -04:00