Phase 1 gate step 4 failed: setting Enabled = 0 to take a node out of service
returns 422 ClusterEnabledNodeCountMismatch, because
DraftValidator.ValidateClusterTopology requires the enabled-node count to equal
ServerCluster.NodeCount. On a Warm/Hot pair — every cluster on the rig, and
every cluster in the target topology — Enabled can therefore never be the
maintenance hatch. The plan called step 4 "the check that makes step 3
acceptable to ship", so Task 3's behaviour change was not shippable as it stood:
a node down for maintenance would block every deployment to its cluster.
The two rules were each reasonable and contradictory together — the validator
reads Enabled as "part of the declared topology", Phase 1 additionally read it
as "expect an ack". Split the meanings rather than weaken either rule:
Enabled part of the declared topology (validator, untouched)
MaintenanceMode expected to participate now (coordinator + reconciler)
Rejected alternatives: counting configured rather than enabled nodes (drops the
guard against booting a pair into InvalidTopology); downgrading the rule to a
warning (weakens a deploy gate for everyone); shipping with no hatch.
Sabotage: dropping !n.MaintenanceMode from the coordinator query turns the new
test red. It also asserts both nodes remain Enabled, so the fix cannot quietly
regress to disabling the row after all.
Configuration.Tests 95/95, ControlPlane.Tests 101/101, solution builds clean.
Claude-Session: https://claude.ai/code/session_01GASWkNEi68FSCtvr6rLoEW
The design doc still described the downing gap and the RoleLeader derivation as
open. Both shipped earlier today, so 6.2 and 4 now carry the fix and its pin
instead of the diagnosis, and 7 marks 0a/0b done. 0a's live gate stays open and
is explicitly deferred to phase 7: the failure only appears in a 1-vs-1 split and
docker-dev is a single six-node mesh, so there is no rig on which to drill it
until the meshes are actually split.
The phase 1 plan lands with one finding that changes its shape. The design pairs
"ClusterNode gains address columns" with "coordinator sources its expected-ack set
from the DB" as though they were one change; they are independent, and the second
is far smaller than it reads. ClusterNode.NodeId is ALREADY in the coordinator's
identifier space — the rig seeds central-1:4053 and so on, because
NodeDeploymentState.NodeId is FK-bound to it and the coordinator's
membership-derived ids already satisfy that FK. That the deploy path works today
is standing proof the two sets agree.
What is not small is the semantics. Membership-derived and DB-derived sets differ
on a configured-but-stopped node: today the deployment seals green without it —
telling the operator the fleet is deployed when it is not — and afterwards it
would fail at the apply deadline. Failing is the better behaviour and is required
once central cannot see cluster membership, but it needs an escape hatch or a node
down for maintenance blocks every deploy. ClusterNode.Enabled already is that
hatch, so the plan filters on it and gates the phase on a live check that proves
both halves: a stopped node fails the deploy legibly, and disabling it lets the
deploy seal.
The plan also adds a task the design does not have: AkkaPort duplicates the node's
own Cluster:Port with nothing making them agree, and an unenforced duplicated
address is the same shape as the Modbus/ModbusTcp and TwinCat/Focas drifts already
recorded here.
Phases 2-7 remain unstarted. They change the running data path and rewrite the
rig, and each needs its own plan and live gate.
Claude-Session: https://claude.ai/code/session_01GASWkNEi68FSCtvr6rLoEW