Commit Graph

4 Commits

Author SHA1 Message Date
Joseph Doherty e299dc090a chore(ga): retire G1 - delete the stale Phase 6 compliance scripts; v2 GA exit criteria all met/waived/retired
v2-ci / unit-tests (push) Has been cancelled
The phase-6-*.ps1 scripts checked v2 Phase 6 code that later commits deliberately
deleted (76310b88 v1 Server/Admin, #522, #524, LiteDB cache, v3 migration squash):
56/56 failures were retired files, so they could not pass. Owner retired G1; G2
plus the per-area suites cover the invariants. phase-7-compliance.ps1 is untouched.
2026-11-13 10:33:43 -05:00
Joseph Doherty c9bc358dc9 feat(cli): print array values; docs: #615 G9 PASS with otopcua-cli, G8 waived
v2-ci / unit-tests (push) Has been cancelled
G9 ran on an isolated 2-node pair (otopcua-g9, 003c7f89, Mode unset as
deployed) with otopcua-cli as the owner-approved client: A1-A3, A5, A7, A8
(graceful, ~11 s gap), B2 (docker kill, failover <1 s, ~2 s gap, 0 Bad,
survivor 250 at +44 s) and B3 (no failback) pass; A4/A5b unmet under Unset,
met under Warm (#717). G8 (CTT) waived by the owner for GA; G5 is the only
open exit criterion.

The run found the CLI printing every array as System.String[] (ServerArray
unreadable); ValueFormatter now renders [a, b] / hex for read, subscribe and
historyread, with tests. Runbook A4/A5b text updated for the #717 modes.
Evidence: docs/plans/evidence/2026-11-13-615-g9/RESULTS.md.
2026-11-13 07:46:56 -05:00
Joseph Doherty e31888c9fd docs(redundancy): rewrite phase 6.3 interop runbook for the current model and correct standard NodeIds (lmxopcua#716)
Claude-Session: https://claude.ai/code/session_01GT67AEHd2Acv1YPwGfXEoV
2026-11-09 12:30:03 -05:00
Joseph Doherty 16a87b08f3 docs: add four planning runbooks for Phase 6.3 interop, v2 GA gates, live-hardware validation, and alarms worker wiring
Produces docs/plans/ entries for tasks #13, #15, #16, and #17-#20:
- phase-6-3-redundancy-interop-plan.md: automation boundary analysis,
  concrete test matrix (A/B/C blocks), and a step-by-step cutover
  runbook for the deferred Stream F client interop work
- v2-ga-lab-gates-plan.md: exact gate list with command, pass criterion,
  and owner for each of the nine v2 GA exit criteria
- live-hardware-validation-runbooks.md: one runbook per driver (FOCAS
  CNC smoke #54, AB CIP live-boot, TwinCAT wire-live) with preconditions,
  procedure, expected results, and recording template
- alarms-worker-wiring-plan.md: focused plan for A.2/A.3-A.4/C.1/D.1
  worker wiring in the mxaccessgw sibling repo, documenting the
  discovered AVEVA API surface, the architectural decision that blocks
  A.2, the dependency order, and what each item needs to unblock

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>