Joseph Doherty f8a43dfe96 docs(plans): Phase 3 COMPLETE at DoD — deletion review-approved, grep-gates clean, full suite 9326/0 green on branch tip
Task 3.1: 7 ordered deletion steps + MeshPaths review fix, spec+code reviews closed.
Task 3.2: docs sweep + accuracy review, scadaproj index pushed on its main.
DoD full-suite: run 3 exit 0 (50 suites, 9326 passed); runs 1-2 each hit one
pre-existing unrelated timing flake (3 distinct tests, all untouched by the
branch, 9/9 green in isolation). Also records the exit-code-capture trap found
in run 1 and its retroactive caveat on Phase 2's check-8 wording.

Merge to master is user-owned — STOPPED at the Phase 3 DoD.

Claude-Session: https://claude.ai/code/session_014WNM4vjoVksyyBraTXSZE1
2026-08-06 16:56:17 -04:00
Joseph Doherty 5510452662 docs(plans): Phase 2 COMPLETE — gate PASS 8/8, soak 14/14 clean, full suite exit 0 on cutover SHA; carry-forwards closed/re-carried
v2-ci / build (push) Successful in 4m30s
v2-ci / unit-tests (push) Failing after 15m27s
Claude-Session: https://claude.ai/code/session_014WNM4vjoVksyyBraTXSZE1
2026-08-06 13:26:56 -04:00
Joseph Doherty cf229a9579 docs(plans): phases 2-4 — targeted-test policy + Task 2.0 (must-fix: honest PreStart-race logging) before the cutover 2026-08-06 09:24:16 -04:00
Joseph Doherty ddea041309 docs(plans): Phase 1B COMPLETE — gate PASS 7/7, awaiting PR/merge 2026-08-06 09:21:20 -04:00
Joseph Doherty 4a2a3d3ab8 docs(plans): restore tasks.json union after rebase — 1A rows + 1B completions 2026-08-06 08:42:37 -04:00
Joseph Doherty 973ce7ee26 docs(plans): 1B.2 close-out — reviews ✅, deadline Critical fixed + pinned 2026-08-06 08:42:11 -04:00
Joseph Doherty 1368578435 docs(plans): 1B.1 close-out — reviews ✅ 2026-08-06 08:42:11 -04:00
Joseph Doherty 252618182f docs(plans): Phase 1A close-out — carry-forwards from the gate, #546 filed 2026-08-06 08:39:45 -04:00
Joseph Doherty fbf7b70847 docs(plans): 1A.2 + 1B.2 close-out — register items 1-2 CLOSED, defect log (3), carry-forwards, decisions 2026-08-06 06:58:34 -04:00
Joseph Doherty 2edef72f6f docs(plans): 1A.1 close-out — reviews ✅, plan FromEnvelope wording fix 2026-08-06 05:19:07 -04:00
Joseph Doherty fe2ae81666 docs(plans): Phase 0 COMPLETE — gate PASS 4/4, issues #542/#543 filed, awaiting PR/merge 2026-08-06 05:00:26 -04:00
Joseph Doherty c2bfad4af6 docs(plans): Batch B close-out — Phase 1A security register, issue queue, tracking 2026-08-06 04:24:45 -04:00
Joseph Doherty f8325373ef docs(plans): Task 0.2 close-out — tracking + Phase 1 dispatch notes 2026-08-06 03:29:02 -04:00
Joseph Doherty 09db9e47de chore(mesh): Batch A review close-out — fusion-invariant note on DispatchTimeoutSeconds, tracking updates 2026-08-06 03:12:09 -04:00
Joseph Doherty 9e9a963255 docs(plans): ClusterClient→gRPC migration program — design, implementation plan, live-gate template, central tracking doc 2026-08-06 02:44:11 -04:00