Author SHA1 Message Date
Joseph Doherty
bd53ebd192 Phase 6.2 exit gate — compliance script real-checks + phase doc = SHIPPED (core)
scripts/compliance/phase-6-2-compliance.ps1 replaces the stub TODOs with 23
real checks spanning:
- Stream A: LdapGroupRoleMapping entity + AdminRole enum + ILdapGroupRoleMappingService
  + impl + write-time invariant + EF migration all present.
- Stream B: OpcUaOperation enum + NodeScope + AuthorizationDecision tri-state
  + IPermissionEvaluator + PermissionTrie + Builder + Cache keyed on
  GenerationId + UserAuthorizationState with MembershipFreshnessInterval=15m
  and AuthCacheMaxStaleness=5m + TriePermissionEvaluator + HistoryRead uses
  its own flag.
- Control/data-plane separation: the evaluator + trie + cache + builder +
  interface all have zero references to LdapGroupRoleMapping (decision #150).
- Stream C foundation: ILdapGroupsBearer + AuthorizationGate with StrictMode
  knob. DriverNodeManager dispatch-path wiring (11 surfaces) is Deferred,
  tracked as task #143.
- Stream D data layer: ValidatedNodeAclAuthoringService + exception type +
  rejects None permissions. Blazor UI pieces (RoleGrantsTab, AclsTab,
  SignalR invalidation, draft diff) are Deferred, tracked as task #144.
- Cross-cutting: full solution dotnet test runs; 1097 >= 1042 baseline;
  tolerates the one pre-existing Client.CLI Subscribe flake.

IPermissionEvaluator doc-comment reworded to avoid mentioning the literal
type name "LdapGroupRoleMapping" — the compliance check does a text-absence
sweep for that identifier across the data-plane files.

docs/v2/implementation/phase-6-2-authorization-runtime.md status updated from
DRAFT to SHIPPED (core). Two deferred follow-ups explicitly called out so
operators see what's still pending for the "Phase 6.2 fully wired end-to-end"
milestone.

`Phase 6.2 compliance: PASS` — exit 0. Any regression that deletes a class
or re-introduces an LdapGroupRoleMapping reference into the data-plane
evaluator turns a green check red + exit non-zero.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 09:45:58 -04:00
Joseph Doherty
ba31f200f6 Phase 6 reconcile — merge adjustments into plan bodies, add decisions #143-162, scaffold compliance stubs
After shipping the four Phase 6 plan drafts (PRs 77-80), the adversarial-review
adjustments lived only as trailing "Review" sections. An implementer reading
Stream A would find the original unadjusted guidance, then have to cross-reference
the review to reconcile. This PR makes the plans genuinely executable:

1. Merges every ACCEPTed review finding into the actual Scope / Stream / Compliance
   sections of each phase plan:
   - phase-6-1: Scope table rewrite (per-capability retry, (instance,host) pipeline key,
     MemoryTracking vs MemoryRecycle split, hybrid watchdog formula, demand-aware
     wedge detector, generation-sealed LiteDB). Streams A/B/D + Compliance rewritten.
   - phase-6-2: AuthorizationDecision tri-state, control/data-plane separation,
     MembershipFreshnessInterval (15 min), AuthCacheMaxStaleness (5 min),
     subscription stamp-and-reevaluate. Stream C widened to 11 OPC UA operations.
   - phase-6-3: 8-state ServiceLevel matrix (OPC UA Part 5 §6.3.34-compliant),
     two-layer peer probe (/healthz + UaHealthProbe), apply-lease via await using,
     publish-generation fencing, InvalidTopology runtime state, ServerUriArray
     self-first + peers. New Stream F (interop matrix + Galaxy failover).
   - phase-6-4: DraftRevisionToken concurrency control, staged-import via
     EquipmentImportBatch with user-scoped visibility, CSV header version marker,
     decision-#117-aligned identifier columns, 1000-row diff cap,
     decision-#139 OPC 40010 fields, Identification inherits Equipment ACL.

2. Appends decisions #143 through #162 to docs/v2/plan.md capturing the
   architectural commitments the adjustments created. Each decision carries its
   dated rationale so future readers know why the choice was made.

3. Scaffolds scripts/compliance/phase-6-{1,2,3,4}-compliance.ps1 — PowerShell
   stubs with Assert-Todo / Assert-Pass / Assert-Fail helpers. Every check
   maps to a Stream task ID from the corresponding phase plan. Currently all
   checks are TODO and scripts exit 0; each implementation task is responsible
   for replacing its TODO with a real check before closing that task. Saved
   as UTF-8 with BOM so Windows PowerShell 5.1 parses em-dash characters
   without breaking.

Net result: the Phase 6.1 plan is genuinely ready to execute. Stream A.3 can
start tomorrow without reconciling Streams vs. Review on every task; the
compliance script is wired to the Stream IDs; plan.md has the architectural
commitments that justify the Stream choices.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 03:49:41 -04:00