chore(ga): retire G1 - delete the stale Phase 6 compliance scripts; v2 GA exit criteria all met/waived/retired
v2-ci / unit-tests (push) Has been cancelled

The phase-6-*.ps1 scripts checked v2 Phase 6 code that later commits deliberately
deleted (76310b88 v1 Server/Admin, #522, #524, LiteDB cache, v3 migration squash):
56/56 failures were retired files, so they could not pass. Owner retired G1; G2
plus the per-area suites cover the invariants. phase-7-compliance.ps1 is untouched.
This commit is contained in:
Joseph Doherty
2026-11-13 10:33:43 -05:00
parent f93a1179dd
commit e299dc090a
9 changed files with 22 additions and 586 deletions
@@ -11,8 +11,8 @@
>
> **Source of truth**: `docs/Redundancy.md` (election, tiers, downing, manual failover, `ServerArray`),
> `src/Core/ZB.MOM.WW.OtOpcUa.Cluster/Redundancy/ServiceLevelCalculator.cs` and the tests named below.
> `docs/v2/redundancy-interop-playbook.md` and `scripts/compliance/phase-6-3-compliance.ps1` are
> **historical** (they still name the deleted types and old bands) and must not be used as pass criteria.
> `docs/v2/redundancy-interop-playbook.md` is **historical** (it still names the deleted types and old bands) and must
> not be used as pass criteria. `scripts/compliance/phase-6-3-compliance.ps1` was deleted when G1 was retired (2026-11-13).
## Standard variables used by this plan