Phase 6.4 exit gate — compliance real-checks + phase doc = SHIPPED (data layer)
scripts/compliance/phase-6-4-compliance.ps1 turns stub TODOs into 11 real checks covering: - Stream A data layer: UnsImpactAnalyzer + DraftRevisionToken + cross-cluster rejection (decision #82) + all three move kinds (LineMove / AreaRename / LineMerge). - Stream B data layer: EquipmentCsvImporter + version marker '# OtOpcUaCsv v1' + decision-#117 required columns + decision-#139 optional columns including DeviceManualUri + duplicate-ZTag rejection + unknown-column rejection. Four [DEFERRED] surfaces tracked explicitly with task IDs: - Stream A UI drag/drop (task #153) - Stream B staging + finalize + UI (task #155) - Stream C DiffViewer refactor (task #156) - Stream D OPC 40010 Identification sub-folder + Razor component (task #157) Cross-cutting: full solution dotnet test passes 1159 >= 1137 pre-Phase-6.4 baseline; pre-existing Client.CLI Subscribe flake tolerated. docs/v2/implementation/phase-6-4-admin-ui-completion.md status updated from DRAFT to SHIPPED (data layer). Four Blazor / SignalR / EF / address-space follow-ups tracked as tasks — the visual-compliance review pattern from Phase 6.1 Stream E applies to each. `Phase 6.4 compliance: PASS` — exit 0. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -1,6 +1,14 @@
|
||||
# Phase 6.4 — Admin UI Completion
|
||||
|
||||
> **Status**: DRAFT — Phase 1 Stream E shipped the Admin scaffold + core pages; several feature-completeness items from its completion checklist (`phase-1-configuration-and-admin-scaffold.md` §Stream E) never landed. This phase closes them.
|
||||
> **Status**: **SHIPPED (data layer)** 2026-04-19 — Stream A.2 (UnsImpactAnalyzer + DraftRevisionToken) and Stream B.1 (EquipmentCsvImporter parser) merged to `v2` in PR #91. Exit gate in PR #92.
|
||||
>
|
||||
> Deferred follow-ups (Blazor UI + staging tables + address-space wiring):
|
||||
> - Stream A UI — UnsTab MudBlazor drag/drop + 409 concurrent-edit modal + Playwright smoke (task #153).
|
||||
> - Stream B follow-up — EquipmentImportBatch staging + FinaliseImportBatch transaction + CSV import UI (task #155).
|
||||
> - Stream C — DiffViewer refactor into base + 6 section plugins + 1000-row cap + SignalR paging (task #156).
|
||||
> - Stream D — IdentificationFields.razor + DriverNodeManager OPC 40010 sub-folder exposure (task #157).
|
||||
>
|
||||
> Baseline pre-Phase-6.4: 1137 solution tests → post-Phase-6.4 data layer: 1159 passing (+22).
|
||||
>
|
||||
> **Branch**: `v2/phase-6-4-admin-ui-completion`
|
||||
> **Estimated duration**: 2 weeks
|
||||
|
||||