docs: fix two stale mesh-program claims found in review (Phase 5 gate passed; Phase 6 ended fleet-wide gossip)

Review of the ClusterClient-deletion docs sweep (406b1ae5) flagged two
pre-existing staleness items in the swept files, unrelated to ClusterClient
but caught while touching the same passages:

- docs/Telemetry.md: the Phase 5 telemetry section's Status line still said
  "code-complete ... live gate has not yet run" — the gate PASSED 2026-07-23
  (merge 35552a96), already recorded in CLAUDE.md. Updated to match.
- docs/v2/config-db-schema.md: the AkkaPort/GrpcPort note asserted in the
  present tense that "central shares a gossip ring with every node," which
  Phase 6 (2026-07-24) ended — central now runs one 2-node Akka mesh per
  application Cluster and reaches a site pair only over gRPC. Reworded the
  premise to past tense so it no longer contradicts the ClusterClient-deleted
  parenthetical sitting right after it.

docs-only; dotnet build ZB.MOM.WW.OtOpcUa.slnx stays green (0 errors).

Claude-Session: https://claude.ai/code/session_014WNM4vjoVksyyBraTXSZE1
This commit is contained in:
Joseph Doherty
2026-08-06 16:30:47 -04:00
parent 406b1ae5ac
commit 8e25ed55f6
2 changed files with 13 additions and 9 deletions
+2 -2
View File
@@ -259,7 +259,7 @@ otherwise), and `Grpc` mode on either side requires a non-empty `ApiKey` — bot
naturally node-sourced and fleet-wide-fanned, so putting central in the client role — dialing out
to each node by its `ClusterNode`-recorded address — is what lets telemetry survive the mesh split
cleanly: central never needs cluster membership with a site's mesh to keep watching it.
- **Status:** code-complete on `feat/mesh-phase5`; the live gate (flip the docker-dev rig to `Grpc`,
- **Status:** merged to `master` (`35552a96`); the live gate (flip the docker-dev rig to `Grpc`,
confirm all panels stay green with the DPS telemetry bridges unspawned, kill-and-reconnect a site
node) has not yet run. See `docs/plans/2026-07-22-per-cluster-mesh-program.md` § Phase 5 and
node) PASSED 2026-07-23. See `docs/plans/2026-07-22-per-cluster-mesh-program.md` § Phase 5 and
`docs/plans/2026-07-23-mesh-phase5-grpc-telemetry-stream.md` for the implementation plan.