docs(archreview): round-2 COMPLETE capstone — all 12 plans merged @31c98200
All 12 R2 plans executed + merged (PRs #426-#437) in 3 waves. Consolidated unit sweep green on merged master; 3 failures confirmed pre-existing/environmental (not R2). Records the PR/wave map, unit-sweep tallies, and the deferred integration / docker-dev / 2-node-rig / VPN heavy-pass checklist.
This commit is contained in:
@@ -5,6 +5,12 @@
|
||||
> 2026-07-12 **re-review at `f6eaa267`** produced an updated 12-item action list
|
||||
> ([`../00-OVERALL.md`](../00-OVERALL.md)) — see **Round 2 plans** below.
|
||||
|
||||
> **✅ 2026-07-13 — ALL 12 ROUND-2 PLANS EXECUTED + MERGED** to `master` (`31c98200`), each as a Gitea PR
|
||||
> (#426–#437) in 3 dependency-ordered waves. Consolidated unit sweep green (integration + live-`/run` gates
|
||||
> deferred to a serialized heavy pass). See the "Round-2 COMPLETE" capstone at the bottom of
|
||||
> [`STATUS.md`](STATUS.md) for the PR/wave map, unit-sweep tallies, the 3 confirmed-pre-existing failures, and
|
||||
> the deferred heavy/live-pass checklist.
|
||||
|
||||
## Round 2 plans (2026-07-12, verified at `f6eaa267`)
|
||||
|
||||
One plan per action item in the updated `00-OVERALL.md` prioritized list. Each verifies its findings
|
||||
|
||||